AD26-7-000 · 2026-08-21 · ENGIE North America Inc.

Post-Conference Comments of ENGIE North America, Inc. re FERC's technical discussion of Governance and Stakeholder Reforms in the PJM Interconnection LLC…

Text extracted from the eLibrary original (SHA-256 94ffba8768858643…). Download the original from the official source.

Contents · 6 sections
  1. I. COMMENTS p. 1
  2. A. PJM Board Independence p. 2
  3. B. Section 205 Filing Rights p. 5
  4. C. Stakeholder Process p. 9
  5. D. State Participation p. 9
  6. II. CONCLUSION p. 11

Read topic-matched comments in AD26-7

Topics in the text: Cost allocation · Reliability and curtailment · Registry access

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) PJM Governance and Stakeholder Reforms ) Docket No.
Read this passage

I. COMMENTS

printed heading

COMMENTS ENGIE’s pre-technical conference comments address several of the questions issued by the Commission in the Appendix to its Notice Requesting Post-Conference Comment (“Notice”) issued on July 30, 2026.
Read this passage

A. PJM Board Independence

printed heading

Board members must stand for re-election following the conclusion of the initial five-year term. 2) Should there be a maximum number of years that a Board member may serve (e.g., 10 years)?
Read this passage

B. Section 205 Filing Rights

printed heading · Topic match: Cost allocation

However, if approval is not needed, PJM must still bring the filing through the stakeholder process for discussion, review and an advisory vote. 14) Should the Organization of PJM States Inc (OPSI) have “jump ball” rights over resource adequacy and transmission cost allocation filings when a…
Read this passage Filed comments: Cost allocation

C. Stakeholder Process

printed heading

Stakeholder Process Questions/Comments Yes No 16) Should the approval threshold in the Members Committee be lowered from two-thirds sector-weighted voting?
Read this passage

D. State Participation

printed heading · Topic match: Cost allocation

AD26-07-000 Page 10 Questions/Comments Yes No 19) Should state representatives have a formal voting role in the stakeholder process (limited to certain topics, such as resource adequacy and regional transmission cost allocation) in addition to the consumer advocate votes?
Read this passage Filed comments: Cost allocation

II. CONCLUSION

printed heading

CONCLUSION ENGIE appreciates the opportunity to engage with the Commission, PJM, the PJM states, and other PJM stakeholders to consider region pursues improvements to governance and the stakeholder process.
Read this passage

CERTIFICATE OF SERVICE

printed heading

Dated at Boston, MA this 21st day of August, 2026. /s/ Sarah Bresolin Silver Sarah Bresolin Silver Vice President Government & Regulatory Affairs ENGIE North America, Inc. 1360 Post Oak Blvd.