ER27-529-000 · 2026-11-16 · New York Independent System Operator, Inc., Central Hudson Gas & Electric Corporation and 5 others

Att H Pro Forma LL Interconnection Agreement

Text extracted from the eLibrary original (SHA-256 88f1688e44b0d75c…). Download the original from the official source.

Read the parent filing

Topics in the text: Registry access · Connecting load and generation · Credit and exit

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Attachment H

printed heading

Attachment H Pro Forma Large Load Interconnection Agreement 44.16.11 Appendix 11 to Attachment LL – Pro Forma Interconnection Agreement [TRANSMISSION OWNER] SERVICE AGREEMENT NO. [●] PRO FORMA LARGE LOAD INTERCONNECTION AGREEMENT BETWEEN [LEGAL NAME OF TRANSMISSION OWNER] (Transmission Owner) AND…
Read this passage

TABLE OF CONTENTS

printed heading · Topic match: Registry access

During the Term and for three (3) years thereafter (or, with respect to Critical Energy/Electric Infrastructure Information and information concerning the physical or cyber security of the TO System, for so long as such information remains non-public), each Party shall hold the other’s Confidential…
Read this passage