ER27-454-000 · 2026-11-09 · PJM

FERC rendition of the electronically filed tariff records

Contents · 4 sections
  1. Attachment K-Appendix, section 6.6(c) or the defaults below: p. 28
  2. A. It has a documented plan in place to retire the resource prior to or during the Delivery p. 39
  3. B. Significant physical operational restrictions cause long term or permanent changes to the p. 39
  4. C. The Capacity Market Seller is involved in an ongoing regulatory proceeding (e.g. – p. 39

Read the parent filing

Topics in the text: Credit and exit · Cost allocation · Connecting load and generation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Credit and exit

Provisional Interconnection Service: “Provisional Interconnection Service” shall mean interconnection service provided by Transmission Provider associated with interconnecting the Interconnection Customer’s Generating Facility to Transmission Provider’s Transmission System and enabling that…
Read this passage

Attachment K-Appendix, section 6.6(c) or the defaults below:

printed heading · Topic match: Connecting load and generation

Surplus Interconnection Service: “Surplus Interconnection Service” shall mean any unneeded portion of Interconnection Service established in an Interconnection Service Agreement, such that if Surplus Interconnection Service is utilized, the total amount of Interconnection Service at the Point of…
Read this passage

A. It has a documented plan in place to retire the resource prior to or during the Delivery

printed heading

It has a documented plan in place to retire the resource prior to or during the Delivery Year, and has submitted a notice of Deactivation to the Office of the Interconnection consistent with Tariff, Part V, section 113.1, without regard to whether the Office of the Interconnection has requested the…
Read this passage

B. Significant physical operational restrictions cause long term or permanent changes to the

printed heading

Significant physical operational restrictions cause long term or permanent changes to the installed capacity value of the resource, or the resource is under major repair that will extend into the applicable Delivery Year, that will result in the imposition of RPM performance penalties pursuant to…
Read this passage

C. The Capacity Market Seller is involved in an ongoing regulatory proceeding (e.g. –

printed heading · Topic match: Credit and exit

The Reliability Backstop Procurement credit requirements described herein shall be separate from and additional to any credit requirements for participation in RPM Auctions and bilateral transactions under Tariff, Attachment DD, section 4.6, and other market activity in the PJM Markets, as set…
Read this passage