ER26-3380-000 · 2026-08-20 · Individual No Affiliation

Attachment_B_PJM_ELCC_Sensitivity_Analyses_May2025

Text extracted from the eLibrary original (SHA-256 91575e5e2af4d2cb…). Download the original from the official source.

Read the parent filing

Read topic-matched comments in ER26-3380

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Pages 1 to 4

page range

PJM © 2025 www.pjm.com | Public ELCC Accreditation Methodology: Update on Sensitivity Analyses ELCCSTF May 22, 2025 PJM © 2025 2 www.pjm.com | Public ELCC Sensitivity Analyses • This presentation provides ELCC sensitivity analyses that were requested by stakeholders and/or initiated by PJM to help…
Read this passage

Pages 5 to 8

page range

PJM © 2025 5 www.pjm.com | Public Base Case PJM © 2025 6 www.pjm.com | Public 1.
Read this passage

Pages 9 to 12

page range

Removing Forced Outages from PV1 and WSE (“NoPV1WSE”) • The forced outage data from Polar Vortex 1 (PV1) and Winter Storm Elliott (WSE) were removed from the model – PV1 was defined as including 3 days Jan 6 – Jan 8, 2014 – WSE was defined as including 4 days Dec 23 – Dec 26, 2022 • After removing…
Read this passage

Pages 13 to 16

page range

PJM © 2025 13 www.pjm.com | Public Improve Alignment of Load Scenarios with Temperature Bins (“Align”) Target Forecast Day 26/27 A1993 B1993 C1993 …. ….. ….
Read this passage

Pages 17 to 20

page range

Reflect higher Winter output for Unlimited Resources (“WICAP”) Winter Months include November through April PJM © 2025 18 www.pjm.com | Public 5.
Read this passage

Pages 21 to 24

page range

“WICAP & NoPV1WSE” - Decrease in overall system risk (IRM drops and system is less tight) - Almost of LOLH is in the summer season - Significant class ratings increases (except for wind) PJM © 2025 22 www.pjm.com | Public Comparison of All Sensitivity Results • Removing PV1 and WSE forced outages…
Read this passage

Pages 25 to 28

page range

PJM © 2025 25 www.pjm.com | Public ELCC Class Ratings - Sensitivities PJM © 2025 26 www.pjm.com | Public ELCC Class Ratings - Sensitivities PJM © 2025 27 www.pjm.com | Public ELCC Class Ratings - Sensitivities PJM © 2025 28 www.pjm.com | Public ELCC Class Ratings - Sensitivities
Read this passage

Pages 29 to 30

page range

PJM © 2025 29 www.pjm.com | Public ELCC Class Ratings - Sensitivities PJM © 2025 30 www.pjm.com | Public ELCC Class Ratings - Sensitivities
Read this passage