EL25-49-000 · 2025-04-24 · Center for Biological Diversity

Comments of Center for Biological Diversity

Text extracted from the eLibrary original (SHA-256 485691b11b3887a1…). Download the original from the official source.

Contents · 18 sections
  1. I. THRESHOLD ISSUES THE COMMISSION SHOULD CONSIDER IN ADDRESSING p. 2
  2. A. The Commission Should Consider The Environmental Implications Of Any Tariff p. 2
  3. B. The Commission Should Maximize Opportunities For These Facilities To Facilitate p. 2
  4. II. CENTER COMMENTS ON THE COMMISSION'S QUESTIONS p. 2
  5. A. Any Tariff Or Other Regulations Must Protect Consumers From Allowing Private p. 2
  6. B. FERC Should Not Leave Any Regulatory Gaps For These Facilities p. 2
  7. A. The Climate Crisis is an Emergency Requiring Urgent Action to Reduce Greenhouse p. 2
  8. B. The Commission has a Mandate to Facilitate The Nation's Clean Energy Transition p. 2
  9. INTRODUCTION p. 3
  10. DISCUSSION p. 4
  11. I. Threshold Issues the Commission Should Consider in Addressing the Matters p. 4
  12. A. The Commission Should Consider the Environmental Implications of Any Tariff p. 4
  13. B. The Commission Should Maximize Opportunities For These Facilities To p. 15
  14. II. Center Comments On The Commission’s Questions p. 20
  15. A. Any Tariff or Other Regulations Must Protect Consumers from Allowing p. 20
  16. B. FERC Should Not Leave Any Regulatory Gaps For These Facilities. p. 26
  17. A. The Climate Crisis is an Emergency Requiring Urgent Action to Reduce p. 29
  18. B. The Commission Has a Mandate to Facilitate the Nation’s Clean Energy p. 34

Read topic-matched comments in EL25-49

Topics in the text: Cost allocation · Connecting load and generation · Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) PJM Interconnection, L.L.C., et al. ) Docket No.
Read this passage

TABLE OF CONTENTS

printed heading

TABLE OF CONTENTS
Read this passage

I. THRESHOLD ISSUES THE COMMISSION SHOULD CONSIDER IN ADDRESSING

printed heading

THRESHOLD ISSUES THE COMMISSION SHOULD CONSIDER IN ADDRESSING THE MATTERS RAISED IN THIS PROCEEDING
Read this passage

A. The Commission Should Consider The Environmental Implications Of Any Tariff

printed heading

The Commission Should Consider The Environmental Implications Of Any Tariff That Encourages The Growth Of Data Centers And Other Large Load Facilities 1.
Read this passage

B. The Commission Should Maximize Opportunities For These Facilities To Facilitate

printed heading

The Commission Should Maximize Opportunities For These Facilities To Facilitate Renewable Energy Alternatives 1.
Read this passage

II. CENTER COMMENTS ON THE COMMISSION'S QUESTIONS

printed heading

II.
Read this passage

A. Any Tariff Or Other Regulations Must Protect Consumers From Allowing Private

printed heading · Topic match: Cost allocation

Any Tariff Or Other Regulations Must Protect Consumers From Allowing Private Corporations To Shift The Cost Of These Facilities To Ratepayers 1.
Read this passage Filed comments: Cost allocation

B. FERC Should Not Leave Any Regulatory Gaps For These Facilities

printed heading

FERC Should Not Leave Any Regulatory Gaps For These Facilities ADDENDUM
Read this passage

A. The Climate Crisis is an Emergency Requiring Urgent Action to Reduce Greenhouse

printed heading

The Climate Crisis is an Emergency Requiring Urgent Action to Reduce Greenhouse Gases from the Power Sector
Read this passage

B. The Commission has a Mandate to Facilitate The Nation's Clean Energy Transition

printed heading

The Commission has a Mandate to Facilitate The Nation's Clean Energy Transition 3 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) PJM Interconnection, L.L.C., et al. ) Docket No.
Read this passage

INTRODUCTION

printed heading

At bottom, the Commission must ensure that these facilities—and the load growth the facilities are bringing to the Nation’s energy system—is both fair to consumers and consistent with FERC’s statutory mandates.
Read this passage

DISCUSSION

printed heading

DISCUSSION
Read this passage

I. Threshold Issues the Commission Should Consider in Addressing the Matters

printed heading

Threshold Issues the Commission Should Consider in Addressing the Matters Raised in This Proceeding.
Read this passage

A. The Commission Should Consider the Environmental Implications of Any Tariff

printed heading

LBNL-2001637; Electricity consumption in the United States 2022, by leading state, Statista (June 28, 2024), https://www.statista.com/statistics/560913/us-retail-electricity-consumption-by-major-state/. 5 Loten, A., AI-Ready Data Centers Are Poised for Fast Growth, Wall street Journal (Aug. 3,…
Read this passage

B. The Commission Should Maximize Opportunities For These Facilities To

printed heading · Topic match: Reliability and curtailment

FERC must also incentivize renewable energy in co-location agreements to mitigate the data center industry’s massive greenhouse gas emissions.
Read this passage Filed comments: Reliability and curtailment

II. Center Comments On The Commission’s Questions

printed heading

Center Comments On The Commission’s Questions The Center urges the Commission to take the foregoing discussion into account in resolving the issues raised in this proceeding.
Read this passage

A. Any Tariff or Other Regulations Must Protect Consumers from Allowing

printed heading · Topic match: Cost allocation

Any Tariff or Other Regulations Must Protect Consumers from Allowing Private Corporations to Shift the Cost of These Facilities to Ratepayers.
Read this passage Filed comments: Cost allocation

B. FERC Should Not Leave Any Regulatory Gaps For These Facilities.

printed heading · Topic match: Connecting load and generation

That’s a big problem, Canary Media, (February 25, 2025), https://www.canarymedia.com/articles/utilities/utilities-are-flying-blind-on-data-center-demand-thats-a-big- problem. 83 Quentin Good, et al., Big data centers, big problems: The surging environmental and consumer costs of AI, crypto and big…
Read this passage Filed comments: Connecting load and generation

A. The Climate Crisis is an Emergency Requiring Urgent Action to Reduce

printed heading

IPCC, Geneva, Switzerland, p. 88. 32 lock in highly damaging and irreversible changes to the climate for hundreds to thousands of years.96 The global average atmospheric carbon dioxide in 2024 was 424.61 parts per million (ppm), a level not seen for millions of years.97 The last time CO2 in the…
Read this passage

B. The Commission Has a Mandate to Facilitate the Nation’s Clean Energy

printed heading

The Commission Has a Mandate to Facilitate the Nation’s Clean Energy Transition.
Read this passage