EL25-49-000 · 2025-04-24 · Center for Biological Diversity
Comments of Center for Biological Diversity
PDF page 1
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
)
PJM Interconnection, L.L.C., et al.
) Docket No. EL-25-49-000
)
COMMENTS OF CENTER FOR BIOLOGICAL DIVERSITY
PDF page 2
2
TABLE OF CONTENTS
I. THRESHOLD ISSUES THE COMMISSION SHOULD CONSIDER IN ADDRESSING THE MATTERS RAISED IN THIS PROCEEDING
A. The Commission Should Consider The Environmental Implications Of Any Tariff That Encourages The Growth Of Data Centers And Other Large Load Facilities
1. Data Centers And Cryptomining Threaten The Climate
2. These Facilities Also Have Numerous Other Adverse Environmental Impacts
B. The Commission Should Maximize Opportunities For These Facilities To Facilitate Renewable Energy Alternatives
1. These Facilities Can Help Address Load Demand Issues Through Demand Response and Load Flexibility Programs
2. FERC Should Encourage Renewable Energy to Power These Facilities
II. CENTER COMMENTS ON THE COMMISSION'S QUESTIONS
A. Any Tariff Or Other Regulations Must Protect Consumers From Allowing Private Corporations To Shift The Cost Of These Facilities To Ratepayers
1. There Should Be Restrictions On Special Contracts Allowing Utilities to Take Advantage of Opaque Accounting Practices to Pass on the Costs of Supplying Power to High-energy Using Customers
2. Appropriate Oversight Of Cost Allocation Formulas Is Necessary To Protect Against Ratepayers Being Improperly Charged For Infrastructure Costs to Support These Facilities
3. The Commission Must Also Help Ensure That Co-location Arrangements Do Not Increase Wholesale Prices And Distort Electricity Delivery Rates
B. FERC Should Not Leave Any Regulatory Gaps For These Facilities
ADDENDUM
A. The Climate Crisis is an Emergency Requiring Urgent Action to Reduce Greenhouse Gases from the Power Sector
B. The Commission has a Mandate to Facilitate The Nation's Clean Energy Transition
PDF page 3
3
UNITED STATES OF AMERICA
BEFORE THE
FEDERAL ENERGY REGULATORY COMMISSION
)
PJM Interconnection, L.L.C., et al.
) Docket No. EL-25-49-000
)
COMMENTS OF CENTER FOR BIOLOGICAL DIVERSITY
INTRODUCTION
Pursuant to the Federal Energy Regulatory Commission’s (“Commission”) February 20, 2025 Order (“Order”), the Center for Biological Diversity (“Center”) submits the following response to the parties’ March 24, 2025 filings. Feb. 20, 2025 Order at 57. The Center appreciates the opportunity to comment on the Commission’s Order Instituting Proceeding concerning co-location of large loads at generating facilities. The Center is a national, non-profit conservation organization with more than 1.8 million members and online activists who care about the country’s urgent need to expedite the renewable energy transition and protect human health, the natural environment, and species from the ravages of the climate emergency, extinction crisis, and environmental degradation.
As discussed below, in addressing the energy needs of data centers and other large load facilities that are rapidly proliferating across the country, it is vital that the Commission address both the challenges and opportunities these facilities provide. Regarding challenges, to fulfill its statutory obligations—as detailed in the Addendum below—it is critical that the Commission take into account the environmental implications of these facilities, including both the climate change threats they pose and their other environmental impacts. As for opportunities, the Commission should consider how these facilities can help address grid and load needs through
PDF page 4
4
demand response and load flexibility, and how to maximize reliance on renewable energy to address the facilities’ energy demand needs.
In addition, the Center also offers comments below more specifically addressing the issues raised in the Commission’s Order and initial comments. First, our comments detail steps the Commission should take to ensure that any tariff or other measures protect consumers from being forced to subsidize data centers and related facility and infrastructure costs that should be borne by private corporations benefiting from these expenditures. Second, we address the issue of ensuring these facilities do not escape regulation by being mischaracterized as either behind- the-meter or offline. At bottom, the Commission must ensure that these facilities—and the load growth the facilities are bringing to the Nation’s energy system—is both fair to consumers and consistent with FERC’s statutory mandates.
DISCUSSION
I. Threshold Issues the Commission Should Consider in Addressing the Matters Raised in This Proceeding.
A. The Commission Should Consider the Environmental Implications of Any Tariff That Encourages the Growth of Data Centers and Other Large Load Facilities.
As reflected in the comments already in the record, the growth of data centers for Artificial Intelligence (“AI”) and other purposes, as well as of cryptomining facilities, are key drivers of the effort towards co-location arrangements. Before turning to the Commission’s specific questions, therefore, it is vital to address the risks data centers and cryptomining facilities pose to the climate and the environment.11 Our Addendum to these comments below details the climate emergency and urgent need to curb fossil-fuel energy generation to mitigate the climate emergency’s worst impacts, as well as the Commission’s statutory responsibility to take these matters into account in its decision-making.
PDF page 5
5
1. Data Centers and Cryptomining Threaten the Climate.
Data centers, AI, and cryptomining facilities demand enormous amounts of energy, which is why they are prime candidates for co-locations arrangements. However, the load growth these facilities are projected to bring is driving more fossil fuel generation, taking the Nation in the completely wrong direction to address the climate emergency. The Commission has an obligation to take into consideration this strong connection between these facilities and fossil fuels as it considers appropriate regulatory structures.
a. Data Centers, AI, and Crypto-Facilities Demand Seismic-Levels of
Energy.
Data centers are highly energy- and water-intensive. These facilities host vast computing infrastructure—such as server racks, networking equipment, backup power systems, physical security features, and advanced cooling technologies—to process massive amounts of data and support services like artificial intelligence, cryptocurrency mining, photo sharing, and video streaming.
Cloud Service Providers, largely owned and operated by major technology corporations, currently control approximately 67 percent of global cloud infrastructure.2 This dominance, coupled with Big Tech’s strategic prioritization of the AI and cryptocurrency sectors, is fueling a rapid proliferation of conventional and AI-specific data centers, as well as cryptocurrency mining operations, across the United States.
2 Slingerland, C., 13 Top Cloud Service Providers Globally In 2025, (July 18, 2024), https://www.cloudzero.com/blog/cloud-service-providers/.
PDF page 6
6
As of March 2025, the U.S. housed 5,426 recorded data centers.3 In 2023, these facilities consumed 176 terawatt-hours (TWh) of electricity, or 4.4 percent of the country’s total
electricity use—more than the total energy consumption of Ohio in 2022.4 The energy demands of AI applications exacerbate this impact: while a conventional data center rack uses an average of 7 kilowatts (kW), AI data center racks can require up to 50 kW.5 In 2023, AI workloads represented about 20 percent of total data center capacity, and projections indicate a tenfold increase in AI-related electricity consumption by 2026. 6
Cryptocurrency mining (“cryptomining”), which employs energy-intensive
computational systems in facilities like data centers to solve complex algorithms and extract digital assets, represents perhaps the most egregious strain on America’s energy infrastructure. Even though less than 2 percent of U.S. residents are using cryptocurrency for transactions, cryptomining facilities can be even more energy-intensive than AI data centers. As of December 2024, Bitcoin alone was estimated to consume 175.87 TWh annually—surpassing the total
energy use of Pakistan in 2023.7
3 Petroc, Taylor, Leading countries by number of data centers as of March 2025, Statista, (Mar. 21, 2025), https://www.statista.com/statistics/1228433/data-centers-worldwide-by-country/.
4 Shehabi, A., Smith, S.J., Hubbard, A., Newkirk, A., Lei, N., Siddik, M.A.B., Holecek, B., Koomey, J., Masanet, E., Sartor, D. 2024. 2024 United States Data Center Energy Usage Report. Lawrence Berkeley National Laboratory, Berkeley, California. LBNL-2001637; Electricity consumption in the United States 2022, by leading state, Statista (June 28, 2024), https://www.statista.com/statistics/560913/us-retail-electricity-consumption-by-major-state/.
5 Loten, A., AI-Ready Data Centers Are Poised for Fast Growth, Wall street Journal (Aug. 3, 2023), https://www.wsj.com/articles/ai-ready-data-centers-are-poised-for-fast-growth-fadae952.
6 Ramachandran, K., et al, As generative AI asks for more power, data centers seek more reliable, cleaner energy solutions, Deloitte (Nov. 19, 2024), https://www2.deloitte.com/us/en/insights/industry/technology/technology- media-and-telecom-predictions/2025/genai-power-consumption-creates-need-for-more-sustainable-data- centers.html.
7 De Best, R., Bitcoin energy consumption worldwide from February 2017 to February 3, 2025, Statista (Feb. 6, 2025), https://www.statista.com/statistics/881472/worldwide-bitcoin-energy-consumption/.
PDF page 7
7
b. Data Centers, AI, and Crypto-Facilities’ Reliance on Climate-Killing
Fossil Fuels Is Driving Growth in the Fossil Fuel Power Sector.
Today, data centers, artificial intelligence, and cryptocurrency operations predominantly depend on energy sourced from fossil fuels, resulting in substantial emissions of carbon dioxide (CO₂) and other greenhouse gases. For example, each Bitcoin transaction is estimated to generate approximately 535 kilograms of CO₂, equivalent to the emissions from 1,186,233 VISA transactions or 89,203 hours of video streaming on YouTube.8
The immense electricity demand from data centers, AI, and cryptocurrency mining— largely met by fossil-fueled energy—not only accelerates climate change but also drives the continued operation and revival of gas and coal power plants, posing serious environmental risks. For instance, this year, Southern Company, a major U.S. utility, announced that it would be extending the operational lifespan of three coal plants in Georgia and Mississippi to address the growing energy demands of data centers.9 This decision permits the continued operation of a combined 8.2 gigawatts (GW) of fossil fuel-based, environmentally harmful energy capacity.10
Similarly, in February, NRG Energy Inc., GE Vernova, Inc., and The Industrial Company announced their collaboration to build four new fossil gas power plants, totaling more than 5 GW, to provide energy to data centers supporting AI and GenAI operations in the ERCOT and PJM markets.118 Maceka, M., Bitcoin in 2025: 30+ Must-Know Stats on Market Growth, Adoption, & More, Website Planet (Feb. 21, 2025), https://www.websiteplanet.com/blog/bitcoin-statistics/.9 Skidmore, Z., Southern Company to extend life of three coal plants due to data center energy demand, Data Center Dynamics (Feb. 22, 2025), https://www.datacenterdynamics.com/en/news/southern-company-to-extend-life-of- three-coal-plants-due-to-data-center-energy-demand/.10 Id.11 Press Release: NRG Energy, GE Vernova and Kiewit Accelerating New Generation Capacity to Support Demand Growth, Business Wire (Feb. 26, 2025), https://www.businesswire.com/news/home/20250225753165/en/NRG- Energy-GE-Vernova-and-Kiewit-Accelerating-New-Generation-Capacity-to-Support-Demand-Growth.
PDF page 8
8
c. Energy Demand from Data Centers, AI, and Crypto Is Projected to
Grow Exponentially.
The energy footprint of these industries is expected to grow greatly in the coming years and decades, posing significant risks to the stability of the electric grid and potentially undermining national efforts to reduce greenhouse gas emissions.
Current trend analysis shows that global demand for data center capacity could grow by 19 to 27 percent annually through 2030, reaching as much as 171 to 298 GW per year by the end of the decade.12 This is a sharp increase from today’s estimated demand of 60 GW and signals the risk of a major supply shortfall.13 Avoiding this gap will require building at least twice the total data center capacity constructed since 2000, but in less than a quarter of the time.14 The demand for AI-compatible data center capacity alone is anticipated to grow at an average annual rate of approximately 33 percent through 2030.15 By the end of the decade, it is projected that roughly 70 percent of the total demand for data center capacity will be directed toward facilities specifically designed to accommodate advanced artificial intelligence workloads.16 Generative AI—currently the most rapidly expanding application of advanced AI— is expected to represent approximately 40 percent of the total demand.1712 Srivathsan, B., et al., AI power: Expanding data center capacity to meet growing demand, McKinsey & Co. (Oct. 29, 2024), https://www.mckinsey.com/industries/technology-media-and-telecommunications/our-insights/ai-power- expanding-data-center-capacity-to-meet-growing-demand#/.13 Srivathsan, B., et al., AI power: Expanding data center capacity to meet growing demand, McKinsey & Co. (Oct. 29, 2024), https://www.mckinsey.com/industries/technology-media-and-telecommunications/our-insights/ai-power- expanding-data-center-capacity-to-meet-growing-demand#/.14 Id.
15 Id.
16 Id.17 Id.
PDF page 9
9
Projections indicate that the cryptocurrency industry’s energy consumption in the United States is on track to grow at an alarming rate over the next few years. By 2030, data centers— including those supporting cryptocurrency mining—could account for up to 9 percent of the nation’s total electricity use.18 In Texas alone, electricity demand is expected to nearly double, with 60 percent of that growth attributed to cryptomining and data center expansion.19 Further, analysts project that by the end of 2027, approximately 20 percent of the power capacity currently dedicated to Bitcoin mining will be repurposed for AI applications.20 This shift reflects the evolving dynamics of the data center landscape, driven by technological advancements and market demands, while also highlighting the long-term, enduring nature of these investments. The rapid expansion of digital infrastructure—propelled by corporate interests rather than public need—is emerging as a major and accelerating driver of climate disruption. Energy- intensive data centers are straining power grids, increasing fossil fuel demand, and undermining global climate goals. Without urgent regulatory and policy action, this unchecked growth threatens to lock in high-emissions systems for decades to come.
18 Kearney, L., and Roy, M., AI's race for US energy butts up against bitcoin mining, Reuters (August 24, 2024), https://www.reuters.com/technology/artificial-intelligence/ais-race-us-energy-butts-up-against-bitcoin-mining-2024- 08-28/?utm_source=chatgpt.com.19 Hao, C., Texas lawmakers turn on cryptocurrency industry after learning of high power demand projections, Houston Chronicle (June 14, 2024), https://www.houstonchronicle.com/business/energy/article/texas-lawmakers- sour-bitcoin-mining-fearing-19508969.php.20 Kearney, L., and Roy, M., AI's race for US energy butts up against bitcoin mining, Reuters (August 24, 2024), https://www.reuters.com/technology/artificial-intelligence/ais-race-us-energy-butts-up-against-bitcoin-mining-2024- 08-28/?utm_source=chatgpt.com.
PDF page 10
10
2. These Facilities Also Have Numerous Other Adverse Environmental
Impacts.
Beyond greenhouse gas emissions, data centers result in numerous adverse environmental impacts, including impaired air quality, increased noise, high water demand, and harm to special- status species and habitat.
First, data centers degrade air quality in surrounding communities, largely due to diesel backup generators. Since 2017, more than 1 GW of diesel-based energy—enough to power at least 161,969 households for a year—has been approved as emergency power for California data centers alone.21 These generators not only add to greenhouse gas impacts, but they harm public health through emitting nitrogen oxide and particulate matter. Researchers at UC Riverside and Caltech found that an increase in permits for diesel generators at data centers in Virginia since 2023 may have resulted in 14,000 asthma symptom cases and caused as much as $300 million in health care costs.22 By 2030, researchers predict the health burdens of data centers could amount to $20 billion.23
Second, data centers impact the environment through their massive water demand. A mid-sized data center consumes on average around 300,000 gallons of water a day, about as
21 Capital & Main, California needs more data centers—but builders are using a legal loophole to power them with diesel, Fast Company (Jan. 23, 2025), https://www.fastcompany.com/91265352/california-needs-more-data-centers- but-builders-are-using-a-legal-loophole-to-power-them-with-diesel.22 Capital & Main, California needs more data centers—but builders are using a legal loophole to power them with diesel, Fast Company (Jan. 23, 2025), https://www.fastcompany.com/91265352/california-needs-more-data-centers- but-builders-are-using-a-legal-loophole-to-power-them-with-diesel.23 Id.
PDF page 11
11
much as 1,000 U.S. households,24 while a large data center uses 1 to 5 million gallons per day.25 This is because data centers produce a considerable amount of heat, requiring air conditioning to cool the servers or water for evaporative cooling.26 Indeed, data centers rank among the top 10 water-consuming commercial industries in the United States.27 And with the advent of artificial intelligence, each year they require even more: Google’s data centers used 20 percent more water in 2022 than in 2021, while Microsoft’s water use rose by 34 percent.28 This high water demand depletes nearby groundwater and disrupts local ecosystems.
Third, data centers impact surrounding communities through constant noise, well
documented by residents living near data centers throughout the United States.29 Data centers create noise through generators, cooling systems, and energy drawn from the power grid. Beyond simply providing an annoyance, however, noise pollution is the second largest environmental
24 Michael Copley, Data centers, backbone of the digital economy, face water scarcity and climate risk, NPR (Aug. 30, 2022), https://www.npr.org/2022/08/30/1119938708/data-centers-backbone-of-the-digital-economy-face-water- scarcity-and-climate-risk.25 Shannon Osaka, A new front in the water wars: Your internet use, The Washington Post (April 25, 2023), https://www.washingtonpost.com/climate-environment/2023/04/25/data-centers-drought-water-use/.26 Id.27 M. Siddik, A. Shehabi, & L. Marston, The environmental footprint of data centers in the United States, IOP (2021), https://iopscience.iop.org/article/10.1088/1748-9326/abfba1.28 David Berreby, As Use of A.I. Soars, So Does the Energy and Water It Requires, Yale Environment 360 (Feb. 6, 2024), https://e360.yale.edu/features/artificial-intelligence-climate-energy-emissions.29 Bianca Bosker, Why is everything getting louder, The Atlantic (Nov. 2019), https://www.theatlantic.com/magazine/archive/2019/11/the-end-of-silence/598366/; Peter Cary, Some cities suffering from data center noise turn to tough limits, Prince William Times (Feb. 27, 2023), https://www.princewilliamtimes.com/news/some-cities-suffering-from-data-center-noise-turn-to-tough- limits/article_2aa7fb8c-b6aa-11ed-8626-5738aae2f76c.html; Antonio Olivo, Northern Va. is the heart of the internet. Not everyone is happy about that, The Washington Post (Feb. 10, 2023), https://www.washingtonpost.com/dc-md-va/2023/02/10/data-centers-northern-virginia-internet/.
13
individual fitness and the structure of ecological communities.35 In particular, noise can significantly degrade habitat value for migrating songbirds, decreasing feeding behavior and duration.36 One study specifically found a 28% decrease in bird abundance in areas when traffic noise was present compared to when there was no traffic noise.37 And these impacts do not always improve over time: researchers have postulated that some species in areas with chronic noise pollution may become more sensitive to noise stressors instead of becoming habituated or less sensitive to them.38 Thus, ongoing noise could significantly impact special-status and sensitive species and other native wildlife in and around data centers.
Finally, data centers can also harm wildlife by contributing to habitat loss and
fragmentation. As detailed in a 2021 Center for Biological Diversity Report,39 development creates barriers that can affect wildlife behavior, movement patterns, reproductive success, and physiological state, resulting in significant impacts on individual wildlife, populations, communities, landscapes, and ecosystem function.40 For example, habitat fragmentation from
35 Graeme Shannon, et al., A synthesis of two decades of research documenting the effects of noise on wildlife, Biological Reviews, 91(4), 982–1005 (2016), https://doi.org/10.1111/brv.12207.36 Heidi E. Ware, et al., A phantom road experiment reveals traffic noise is an invisible source of habitat degradation, Proceedings of the National Academy of Sciences (Aug. 31, 2015), https://www.pnas.org/doi/10.1073/pnas.1504710112.37 Christopher J. W. McClure, et al., An experimental investigation into the effects of traffic noise on distributions of birds: Avoiding the phantom road. Proceedings of the Royal Society B: Biological Sciences (2013), https://royalsocietypublishing.org/doi/10.1098/rspb.2013.2290.38 Ian Goudie & Ian Jones, Dose-response relationships of harlequin duck behaviour to noise from low-level military jet over-flights in central Labrador, Environmental Conservation, 31(4), 289–298 (2004), https://doi.org/10.1017/S0376892904001651.39 Tiffany Yap, et al., California Connections: How Wildlife Connectivity Can Fight Extinction and Protect Public Safety (2021), https://www.biologicaldiversity.org/campaigns/wildlife-connectivity/pdfs/California-Connections- wildlife-connectivity-report.pdf.40 Ana Ceia-Hasse, et al., Population persistence in landscapes fragmented by roads: Disentangling isolation, mortality, and the effect of dispersal, Ecological Modelling, 375, 45–53 (2018); Nic M. Haddad, et al., Habitat fragmentation and its lasting impact on Earth’s ecosystems, Science Advances, 1(e1500052), 1–9 (2015); William J. Mitsch, et al., Improving the success of wetland creation and restoration with know-how, time, and self-design, Ecological Applications, 6(1), 16–17 (1996); Stephen C. Trombulak, et al., Review of ecological effects of roads on
PDF page 14
14
roads and development has been shown to cause mortalities and harmful genetic isolation in Central Coast and Southern California mountain lions,41 increase local extinction risk in
amphibians and reptiles,42 cause high levels of avoidance behavior and mortality in birds and insects,43 and alter pollinator behavior.44 Habitat fragmentation also severely impacts plant communities: an 18-year study found that reconnected landscapes had nearly 14% more plant
species compared to fragmented habitats, and that number will likely rise as time passes.45 Further, edge effects of data center development, such as traffic, light, and noise
pollution, in and adjacent to open space will likely impact both key, wide-ranging predators, for example, mountain lions and bobcats,46 as well as smaller species with poor dispersal abilities,
terrestrial and aquatic communities, Conservation Biology, 14(1), 18–30 (2001); Rodney van der Ree, et al., Effects of roads and traffic on wildlife populations and landscape function: Road ecology is moving toward larger scales, Ecology and Society, 16(1), 48 (2011).
41 John F. Benson, et al., Extinction vortex dynamics of top predators isolated by urbanization, Ecological Applications, 29(3), e01868 (2019); Kyle D. Gustafson, et al., Multi‐population puma connectivity could restore genomic diversity to at‐risk coastal populations in California, Evolutionary Applications (2021), https://pmc.ncbi.nlm.nih.gov/articles/PMC8867711/.42 Samuel Cushman, et al., Effects of habitat loss and fragmentation on amphibians: A review and prospectus, Biological Conservation, 128, 231–240 (2006); Cheryl S. Brehme, et al., An objective road risk assessment method for multiple species: Ranking 166 reptiles and amphibians in California, Landscape Ecology, 33, 911–935 (2018).43 Anita Benítez-López, et al., The impacts of roads and other infrastructure on mammal and bird populations: A meta-analysis, Biological Conservation, 143, 1307–1316 (2010); Tuula Kantola, Spatial risk assessment of eastern monarch butterfly road mortality during autumn migration within the southern corridor, Biological Conservation, 231, 150–160 (2019); Scott Loss, et al., Estimation of bird-vehicle collision mortality on U.S. roads, Journal of Wildlife Management, 78, 763–771 (2014).44 Ramiro Aguilar, et al., Genetic consequences of habitat fragmentation in plant populations: Susceptible signals in plant traits and methodological approaches, Molecular Ecology, 17, 5177–5188 (2008); M. Goverde, et al., Small-scale habitat fragmentation effects on pollinator behaviour: Experimental evidence from the bumblebee Bombus veteranus on calcareous grasslands, Biological Conservation, 104, 293–299 (2002); Stephen C. Trombulak, et al., Review of ecological effects of roads on terrestrial and aquatic communities, Conservation Biology, 14(1), 18–30 (2000).45 Ellen I. Damschen, et al., Ongoing accumulation of plant diversity through habitat connectivity in an 18-year experiment, Science, 365(6460), 1478–1480 (2019).46 Rafael Barrientos, et al., Nearby night lighting, rather than sky glow, is associated with habitat selection by a top predator in human-dominated landscapes, Philosophical Transactions of the Royal Society B: Biological Sciences, 378(1892), 20220370 (2023); Amy C. Collins, et al., Behavioral responses to anthropogenic noise at highways vary across temporal scales, Frontiers in Ecology and Evolution, 10, 891595 (2022).
PDF page 15
15
such as song birds, small mammals, and reptiles.47 Development that limits movement and dispersal can affect species’ ability to find food, shelter, mates, and refugia after disturbances like fires or floods. Individuals can die off, populations can become isolated, sensitive species can become locally extinct, and important ecological processes like plant pollination and nutrient cycling can be lost. Negative edge effects from human activity, such as traffic, lighting, noise, and pollutants have been found to be biologically significant up to 300 meters (~1000 feet) away from anthropogenic features in terrestrial systems.48
B. The Commission Should Maximize Opportunities For These Facilities To
Facilitate Renewable Energy Alternatives.
As noted, on the current trajectory data centers, AI and cryptomining facilities threaten to undermine progress on addressing the climate emergency. However, as we discuss next, the Commission should also consider the ways in which these facilities could instead help to promote load flexibility, renewable energy, and distributed energy resources.
1. These Facilities Can Help Address Load Demand Issues Through Demand
Response and Load Flexibility Programs.
A recent study from the Duke University Nicholas Institute for Energy, Environment & Sustainability demonstrates how using data centers as flexible load results in tremendous grid reliability benefits and critically reduces the need for new generation. Remarkably, if data
47 Ana Benítez-López, et al., The impacts of roads and other infrastructure on mammal and bird populations: A meta-analysis, Biological Conservation, 143, 1307–1316 (2010); Samuel A. Cushman, Effects of habitat loss and fragmentation on amphibians: A review and prospectus, Biological Conservation, 128, 231–240 (2006); Kathleen S. Delaney, et al., Reptile and Amphibian Diversity and Abundance in an Urban Landscape: Impacts of Fragmentation and the Conservation Value of Small Patches, Ichthyology and Herpetology, 109(2), 424–435 (2021); A.V. Kociolek, et al., Effects of Road Networks on Bird Populations, Conservation Biology, 25(2), 241–249 (2011); Hans Slabbekoorn, et al., Birdsong and anthropogenic noise: Implications and applications for conservation, Molecular Ecology, 17, 72–83 (2008).48 Environmental Law Institute, Conservation thresholds for land use planners (2003), https://www.eli.org/sites/default/files/eli-pubs/d13-04.pdf.
PDF page 16
16
centers could limit their power demands over just a handful of hours each year, the country’s electric grid (across 22 balancing authorities) could accommodate around 100 GW of new load without expanding generation.49
Simple shifts in data center operations would not only prevent the construction of new fossil fuel generation, and thus the creation of new greenhouse gas emissions which drive extreme weather and worsen public health, but it would also save money for the millions of residential customers who otherwise would have subsidized the costs for this new generation. Practically, load flexibility through demand response allows high-energy users like data centers to reduce energy consumption during periods of peak demand by adjusting operations, shifting workloads, and utilizing on-site back-up generation. According to the Nicholas Institute study, if data centers limited load a mere 0.5 percent (less than 44 hours out of the year), the grid could handle 98 GW of new load—enough to power 70 million homes. Increasing curtailment by another half-percent means the grid could handle an additional 28 GW of new load. Load flexibility does raise questions about whether demand response programs could be universal across the data center industry, such as for AI operations that require model training and around-the-clock power. In these cases, curtailment can still occur with “work” shifting geographically to other data centers that are available (i.e. not participating in a curtailment window).
For load flexibility to work, it will require thoughtful coordination across balancing authorities and utilities, but this is necessary to protect the public interest amid the data center boom. It is not in the public interest to saddle customers with higher costs, forcing families to
49 Tyler H. Norris, et al., “Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems,” Nicholas Institute for Energy, Environment, & Sustainability, Duke University (2025), https://nicholasinstitute.duke.edu/sites/default/files/publications/rethinking-load-growth.pdf.
PDF page 17
17
sacrifice paying to keep the lights on or putting food on the table. Furthermore, communities should not have to suffer from worsening air and water quality as utilities invest in more highly polluting fossil fuel generation to meet new data center load, particularly where these harms are easily preventable through load flexibility.
Moreover, if engaging in demand response or power curtailment forces a data center to invest in more back-up generation, utilities and public utilities commissions (“PUCs”) should require that data centers prioritize on-site battery storage in conjunction with renewable energy, such as solar and wind, as well as investments in energy efficiency measures.
2. FERC Should Encourage Renewable Energy to Power These Facilities.
FERC must also incentivize renewable energy in co-location agreements to mitigate the data center industry’s massive greenhouse gas emissions. As discussed in the Addendum below, Congress has repeatedly directed FERC to prioritize the nation’s transition away from fossil fuel power sources and administer new programs to foster renewable energy development. Undoubtedly, these directives apply here, considering that experts expect the expanding data center industry to largely rely on fossil gas. 50 By 2030, additional fossil gas demand could reach 3 to 6 billion cubic feet of gas per day—equivalent to gas consumption of the entire state of Florida per day.51
Further, FERC must encourage renewable energy in co-location agreements to meet its mandate to ensure grid reliability. Section 219 of the Federal Power Act requires FERC to work
50 A. Samuelson, AI is guzzling gas, Heated (Dec. 19, 2024), https://heated.world/p/ai-is-guzzling- gas?utm_source=post-email-title&publication_id=2473&post_id=153337841&utm_campaign=email-post- title&isFreemail=true&r=2g9jj&triedRedirect=true&utm_medium=email.
51 S&P Global, Data Centers: More Gas Will Be Needed To Feed U.S. Growth (Oct. 22, 2024), https://www.spglobal.com/ratings/en/research/articles/241022-data-centers-more-gas-will-be-needed-to-feed-u-s- growth-13290987.
PDF page 18
18
towards a more efficient, reliable, and affordable electrical grid for consumers and specifically to “promote reliable and economically efficient transmission and generation of electricity.”52 To do so, FERC must focus on the grid’s decarbonization, as climate change poses significant, ongoing threats to grid reliability.53 Power outages have doubled over the past 20 years, 54 largely due to climate change-fueled extreme heat, wildfires, winter storms, hurricanes, and other extreme weather events straining the grid.55 For example, in 2021, an extreme winter storm event in Texas caused a massive grid failure, which resulted in 4.5 million homes losing power, at least 57 deaths across 25 counties, and over $195 billion in property damage.56 Data center emissions will only contribute to this issue: By 2030, experts expect the data center industry alone to annually emit about 40% of the United States’ annual greenhouse gas emissions,57 fueling
further outages.
Co-locating data centers with solar and/or wind would protect and promote grid
reliability by expanding data center capacity while avoiding further strain on the grid. Numerous
52 16 U.S.C. § 824s(b)(1).53 Mitali Chatterjee, Avoiding gridlock: The Impact of climate on electric grids, Swiss Re Institute (June 27, 2024), https://www.swissre.com/institute/research/topics-and-risk-dialogues/climate-and-natural-catastrophe-risk/impact- of-climate-on-electric-grids.html.
54 Matthew Brown, Storms batter aging power grid as climate disasters spread, Associated Press (April 5, 2022), https://apnews.com/article/wildfires-storms-science-business-health-7a0fb8c998c1d56759989dda62292379.
55 U.S. Dep’t of Energy, Extreme Weather and Climate Vulnerabilities of the Electric Grid: A Summary of Environmental Sensitivity Quantification Methods (Aug. 16, 2019), https://www.energy.gov/sites/prod/files/2019/09/f67/Oak%20Ridge%20National%20Laboratory%20EIS%20Respo nse.pdf.56 University of Texas at Austin, The Timeline and Events of the February 2021 Texas Electric Grid Blackouts (July 2021), https://energy.utexas.edu/sites/default/files/UTAustin%20%282021%29%20EventsFebruary2021TexasBlackout%2 020210714.pdf.57 Global data center industry to emit 2.5 billion tons of CO2 through 2030, Morgan Stanley says, Reuters (Sept. 3, 2024), https://www.reuters.com/markets/carbon/global-data-center-industry-emit-25-billion-tons-co2-through-2030- morgan-stanley-2024-09-03/.
PDF page 19
19
states have reported unprecedented energy demand due to data centers, which the Virginia State Corporation Commission describes as “creating issues and risks for electric utilities and their customers that have not heretofore been encountered.”58 In Virginia, for example, data centers consumed 25.59% of the state’s total electricity consumed in 2023,59 and experts project that new data centers alone will increase demand for power up to 50 percent by 2030.60 Similarly, the Electric Reliability Council of Texas predicts it will need to double its power generation in the next decade to support skyrocketing data center demand in Texas,61 and Silicon Valley Power predicts the same.62 Rather than adding to these issues, onsite renewable energy helps meet the rising demand for reliable data center power while also lessening the industry’s greenhouse gas emissions.
Solar and wind co-location with data centers is not a new concept, as multiple companies have begun exploring this arrangement both in the United States and internationally. For example, a data center co-located with Japan Renewable Energy Corporation’s solar farm runs entirely on solar,63 and Apple claims that 100% renewable energy powers its data center in
58 Evan Halper, As data centers for AI strain the power grid, bills rise for everyday customers (Nov. 1, 2024), https://www.washingtonpost.com/business/2024/11/01/ai-data-centers-electricity-bills-google-amazon/
59 EPRI, Powering Intelligence Analyzing Artificial Intelligence and Data Center Energy Consumption (May 2024), https://www.epri.com/research/products/000000003002028905.
60 Evan Halper, As data centers for AI strain the power grid, bills rise for everyday customers (Nov. 1, 2024), https://www.washingtonpost.com/business/2024/11/01/ai-data-centers-electricity-bills-google-amazon/61 Phil Prazan, Texas thirsty for energy as datacenters, crypto mining, and EVs increase, NBC DFW (May 9, 2024), https://www.nbcdfw.com/news/politics/lone-star-politics/texas-needs-energy-for-evs-crypto-datamining/3536718/.62 Sebastian Moss, Silicon Valley Power says data center load to double by 2035, will need geothermal power and batteries, Data Center Dynamics (Dec. 5, 2023), https://www.datacenterdynamics.com/en/news/silicon-valley- power-says-data-center-load-to-double-by-2035-will-need-geothermal-power-and-batteries/.63 Georgia Butler, JRE’s 100% onsite solar-powered data center in Japan achieves stable operations, Data Center Dynamics (May 9, 2023), https://www.datacenterdynamics.com/en/news/jres-100-onsite-solar-powered-data-center- in-japan-achieves-stable-operations/.
PDF page 20
20
Maiden, North Carolina, of which a large percentage comes from onsite solar.64 Additionally, Google and partners Intersect Power and TPG Rise Climate recently announced plans to co- locate data centers with high capacity, clean electricity such as solar alongside battery storage in the United States.65
II. Center Comments On The Commission’s Questions
The Center urges the Commission to take the foregoing discussion into account in resolving the issues raised in this proceeding. With regard to the more specific issues the Commission has already raised, the Center offers the following comments.
A. Any Tariff or Other Regulations Must Protect Consumers from Allowing
Private Corporations to Shift the Cost of These Facilities to Ratepayers.
The Commission’s Order addresses several cost allocation issues. E.g. Order at 52-54. As discussed below, the Commission should ensure that the tariff and any other regulatory provisions protect consumers from bearing inappropriate costs related to these facilities. Residential customers across the country are facing increasingly unaffordable utility bills. The median customer utility bill rose 6 percent in January, with residents in Hawaii, Michigan, Maine, and Wisconsin paying some of the highest rates.66 And more than 30 million U.S.
64 Press Release, Apple now globally powered by 100 percent renewable energy, Apple (April 9, 2018), https://www.apple.com/newsroom/2018/04/apple-now-globally-powered-by-100-percent-renewable-energy/.65 Ethan Howland, Google, Intersect Power to develop co-located energy parks with $20B of renewables, storage, Utility Dive (Dec. 11, 2024), https://www.utilitydive.com/news/google-intersect-power-co-located-energy-park- data-center-ferc/735198/; see also, e.g. David Mock and John Bush, DERs Role in a More Reliable, Sustainable, and Resilient Power System, UNC Energy Center (2024), https://www.kenan-flagler.unc.edu/wp- content/uploads/2024/10/DER-Paper.pdf; Wei He, et al., Optimization analysis of different distributed energy configurations for data centers, Sustainable Minerals and Technologies 41 (2024), https://www.sciencedirect.com/science/article/abs/pii/S2214993724001854.66 Giulia Carbonaro, Electricity Prices Surge in US: Map Shows Most Expensive States, Newsweek (February 28, 2025), https://www.newsweek.com/electricity-prices-surge-us-map-shows-most-expensive-states-2037618.
PDF page 21
21
households are energy insecure, and therefore at risk of losing access to life-saving electricity.67 The combination of rising energy costs and worsening wealth inequality contributes to persistently high energy burdens, forcing millions of families into energy poverty.68 Access to electricity is essential yet out of reach for far too many people.
The energy affordability crisis is worsening, especially now as utilities raise rates to pay for expensive large generation assets, like fossil gas plants, and keep un-economic coal plants online longer, to power high-energy consuming data centers. Just recently Kentucky Utilities and Louisville Gas and Electric announced a proposed $3.7 billion investment to build 1.3 GW of new fossil gas generation and 400 megawatts (MW) of battery storage, to power data centers.69 In the Southeast, Duke Energy plans to build 9 GW of new fossil gas to accommodate a forecasted 12 percent increase in demand by 2038.70 This rate of growth is unsustainable, yet utilities are actively pursuing data centers because it benefits their bottom line, even if it comes at the expense of residential customers.
Utilities have an incentive to attract high energy-using customers like data centers because they turn a profit from building high-cost capital projects. The bigger the project, the higher the return on investment. Data centers’ power needs are extraordinary—one large data
67 Just Solutions Collective, Left in the Dark; Utility Disconnections in the United States, (December 19, 2024), https://justsolutionscollective.org/left-in-the-dark-utility-disconnections-in-the-united-states/.68 Selah Goodson Bell and Jean Su, Powerless in the United States: How Corporate Utilities Drive Energy Unaffordability and Climate Chaos, Center for Biological Diversity (January 2025), https://www.biologicaldiversity.org/programs/energy- justice/pdfs/Powerless_Report_2025.pdf?_gl=1*15hp645*_gcl_au*MTgwNTU2NTc5NC4xNzM5NTU2NzI2.69 Ethan Howland, PPL’s Kentucky utilities propose 1.3 GW of gas, 400 MW of storage to meet data center load, (March 3, 2025), https://www.utilitydive.com/news/ppl-kentucky-psc-ku-gas-storage-data-center/741351/.
70 Jeff St. John, More demand, more gas: Inside the Southeast’s dirty power push, Canary Media, (April 11, 2024), https://www.canarymedia.com/articles/utilities/more-demand-more-gas-inside-the-southeasts-dirty-power-push.
PDF page 22
22
center could use as much as 100 MW of power.71 And it is estimated that overall energy consumption by data centers could reach 35 GW by 2030.72 By attracting data centers, utilities have a reason to invest in expensive fossil gas plants, risky nuclear projects, and large-scale transmission that they inevitably profit from. And while they reap millions from these investments, residential customers risk footing the bill for the lion’s share of costs to build a grid capable of withstanding a projected 12 percent increase in load by 2030.73
The current utility rate structure is in large part to blame for this cost-shift, saddling residential customers—especially those who can least afford to pay—with the costs of infrastructure improvements, from new transmission lines and substations to fossil gas plants that pump alarming rates of planet-warming emissions into the atmosphere.
According to a recent report from Harvard Law School’s Environmental and Energy Law Program, utilities are getting away with socializing the costs of the data center boom, and simultaneously keeping rates low to attract data centers, by: (1) entering into special contracts;
(2) taking advantage of discrepancies between federal and state regulations over cost allocation; and (3) relying on co-location agreements. Through all these avenues, utilities are effectively putting the financial burden of accommodating data center load onto the shoulders of working families.7471 Data Center Knowledge, Data Center Power: Fueling the Digital Revolution, (March 22, 2024), https://www.datacenterknowledge.com/energy-power-supply/data-center-power-fueling-the-digital-revolution.
72 Matthew Gooding, Newmark: US data center power consumption to double by 2030,Date Center Dynamics, (January 15, 2024), https://www.datacenterdynamics.com/en/news/us-data-center-power-consumption/.
73 U.S. Department of Energy, DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers, (December 20, 2024), https://www.energy.gov/articles/doe-releases-new-report-evaluating-increase- electricity-demand-data-centers.
74 Eliza Martin and Ari Peskoe, Extracting Profits from the Public: How Utility Ratepayers Are paying for Big Tech’s Power, Environmental & Energy Law Program, Harvard Law School, (March 2025), https://eelp.law.harvard.edu/extracting-profits-from-the-public-how-utility-ratepayers-are-paying-for-big-techs- power/?ref=floodlightnews.org.
PDF page 23
23
1. There Should Be Restrictions on Special Contracts Allowing Utilities to Take Advantage of Opaque Accounting Practices to Pass on the Costs of Supplying
Power to High Energy-Using Customers.
Under current regulatory regimes, utilities can use special contracts to offer data centers discounts while shoring up any shortfalls in costs related to building new power infrastructure through raising rates for its other customers.75 Because PUC orders approving these contracts lack vital third-party analysis and robust public participation, utilities can easily claim that they are isolating data center energy costs from other ratepayers with little oversight to ensure that is indeed the case.
For instance, Duke Energy was shifting costs of a special contract which would have provided a $325 million discount to a new power plant developer onto its other ratepayers.76 While this effort by Duke Energy was properly resolved, the Commission should help ensure these special contracts are not approved by state regulators at the expense of ratepayers who will face higher costs.
2. Appropriate Oversight of Cost Allocation Formulas Is Necessary to Protect Against Ratepayers Being Improperly Charged for Infrastructure Costs to
Support These Facilities.
To serve the power needs of data centers, regional transmission organizations (“RTOs”) are also working to build new transmission with costs trickling their way down to residential ratepayers due to a mismatch between federal and state cost allocation practices. RTOs pass transmission costs onto their member utilities “in proportion to the power system benefits each utility receives, such as lower market prices and improved reliability.”77 This model also relies
75 Id.76 Duke Energy Carolinas, LLC v. NTE Carolinas II, LLC, 111 F.4th 347 (4th Cir. 2024).77 Eliza Martin and Ari Peskoe, Extracting Profits from the Public: How Utility Ratepayers Are paying for Big Tech’s Power, Environmental & Energy Law Program, Harvard Law School, (March 2025),
PDF page 24
24
on the premise that these investments in new transmission are broadly beneficial. State PUCs then apply their own model for how those higher costs are then split across their ratepayer classes (residential, commercial, and industrial). This mismatch in how costs are distributed at the federal and state level ends up “socializing the costs of reliable power delivery [and] now forcing the public to pay for infrastructure designed to supply a handful of exceedingly wealthy corporations.”78
PJM’s transmission buildout to accommodate Virginia’s data center growth shows how this cost-shift plays out and unfairly burdens residential customers. PJM spent $5.1 billion on new transmission, and half of those costs were distributed to member utilities based on their share of power demand.79 Since Virginia’s data center boom was primarily driving the load growth that precipitated the need for more transmission, Virginia utilities ended up paying the remaining half. However, because each state PUC then divvies up transmission costs differently across ratepayer classes, in Maryland for example, residential ratepayers will then pay for two- thirds of the state’s overall share in transmission costs, even though PJM is building this new transmission for Virginia data centers and not the average Maryland residential ratepayer.80https://eelp.law.harvard.edu/extracting-profits-from-the-public-how-utility-ratepayers-are-paying-for-big-techs- power/?ref=floodlightnews.org.
78 Id.79 PJM, PJM Board of Managers Approves Critical Grid Upgrades, PJM Inside Lines, (December 11, 2023), https://insidelines.pjm.com/pjm-board-of-managers-approves-critical-grid-upgrades/.80 Maryland People’s Counsel Protest, Affidavit of Ron Nelson, available at: https://opc.maryland.gov/Portals/0/Files/Publications/Others/MdOPC%20Protest%20and%20Affidavit%20of%20R. %20Nelson%20ER24-843%2002-09-24%20(1).pdf.
PDF page 25
25
Furthermore, while RTOs and utilities make all these investments in new power infrastructure on the premise that there will be significant load growth, should that demand fail to materialize, ratepayers will be left to cover the costs of stranded assets.
3. The Commission Must Also Help Ensure That Co-location Arrangements Do
Not Increase Wholesale Prices and Distort Electricity Delivery Rates.
Data center owners are looking for opportunities to secure power as quickly as possible, and power plants have jumped at the opportunity to offer co-location agreements whereby a data center can directly connect to an existing power plant, behind the meter. The data center therefore does not have to rely on power delivered through the utility’s transmission network, cutting the utility out of profits they eagerly seek.
Data centers can leverage co-location arrangements to argue that they should be exempt from paying any fees to the utility for delivering power. Constellation Energy leaned into this model to get out of paying federal and state-regulated delivery charges.81
As for ratepayers, co-location has the consequence of precluding them from receiving lower delivery rates that they might otherwise have paid when a new energy-intensive customer becomes a utility ratepayer and pays its share of the utility’s cost of service. In the end, residential ratepayers could end up paying higher costs as those costs are no longer distributed across a greater number of customers.
The data center boom is a big gamble. Contracts may fall through, and other less-energy intensive processing models for AI could become more mainstream. Moreover, load growth
81 Martin and Peskoe, Extracting Profits from the Public: How Utility Ratepayers Are paying for Big Tech’s Power; see also PJM Interconnection, LLC, FERC Docket No. ER24-2172 [hereinafter Susquehanna Nuclear Interconnection Agreement], Protest of Exelon Corporation & American Electric Power Service Corporation, Declaration of John J. Reed & Danielle S. Powers, at 4 (Jun. 24, 2024).
PDF page 26
26
projections are still uncertain.82 Therefore, utilities’ quick moves to accommodate projected load growth comes with real consequences for residential customers who will shoulder the overwhelming costs of the nearly 20 GW of gas and transmission infrastructure utilities are building that may not ultimately be needed.83
B. FERC Should Not Leave Any Regulatory Gaps For These Facilities.
The Commission’s Order explains that questions have been raised concerning the
Commission’s jurisdiction over co-located load arrangements. Order at 9-11; 29-31. Some have argued that a sale between co-located load and a generator is beyond FERC’s jurisdiction, id. at 9, 29, while others have asserted that because the generators are subject to FERC jurisdiction, their agreements with direct load also necessarily are subject to FERC rules. Id. at 30. The Center urges that the latter view is the correct application of the Federal Power Act to these facilities.
In particular, in their comments on the Order, the Indicated PJM Owners correctly explain that co-located load should be treated as load in front of the meter and subject to FERC and RTO rules. PJM Comments at 1. They also correctly explain that so long as the generator is grid-connected, it is a misnomer to suggest the co-located load is “fully isolated,” and that so long as the generator is connected to the grid, the entire arrangement is subject to FERC jurisdiction. Id. at 9. Similarly, as PJM explains, a co-located load is subject to FERC jurisdiction
82 Jeff St. John, Utilities are flying blind on data center demand. That’s a big problem, Canary Media, (February 25, 2025), https://www.canarymedia.com/articles/utilities/utilities-are-flying-blind-on-data-center-demand-thats-a-big- problem.83 Quentin Good, et al., Big data centers, big problems: The surging environmental and consumer costs of AI, crypto and big data, Environment America, (January 23, 2025), https://environmentamerica.org/center/resources/big-data- centers-big-problems/.
PDF page 27
27
(and must pay its share of grid services) even if there is a mechanism to prevent energy from the grid from going to the load should the generator go offline. PJM Comments at 14. However, PJM’s comments also suggest that truly isolated co-located loads—where neither the generator nor the load are connected to the grid—could be subject to a regulatory gap, wherein there is neither federal nor state jurisdiction. Id. at 2129. In the Center’s view, given the economic and environmental impacts of data centers in particular, state regulatory authorities should have jurisdiction even in the unusual situation where FERC jurisdiction may not extend. Finally, Public Service Electric and Gas (“PSE&G”) Company asserts that a generator and co-located load is no different from a behind-the-meter generator like a university with solar array. Pub. Svc. Elec. & Gas. Co. Comments at 14-18. Because the latter facility is permitted to net its generation against network load for purposes of transmission cost allocation, PSE&G claims, co-located load is entitled to the same arrangement. Id.
This is incorrect. The reason for allowing this kind of net billing for facilities with behind-the-meter generation is to at least partially compensate for the contribution the energy consumer’s generation provides to the bulk system. Cf. 16 U.S.C. § 2621(d)(11) (setting out the federal “net metering” standard, providing for energy consumer’s generation to be netted against usage). In the scenario at issue here, where a load is located with a generator behind the meter, the consumer and the generator are different entities. Allowing such a customer to be treated as if they were providing the generation themselves makes no sense. Rather, in such arrangements the load should be considered in the same manner as any other load.
*
*
*
Thank you for the opportunity to be heard on these important issues.
Respectfully submitted,
PDF page 28
28
/s/ Howard M. Crystal
Howard M. Crystal
Energy Justice Legal Director
/s/ Camden L. Weber
Camden L. Weber
Climate and Energy Policy Specialist
/s/ Meredith Stevenson
Meredith Stevenson
Urban Wildlands Staff Attorney
/s/ Gabriela R. Sarri-Tobar
Gabriela R. Sarri-Tobar
Senior Energy Justice Campaigner
Center for Biological Diversity
1411 K Street N.W., Suite 1300
Washington, D.C. 20005
hcrystal@biologicaldiversity.org
202-809-6926
PDF page 29
29
ADDENDUM
The Climate Emergency, and FERC’s
Responsibility To Act On This Pressing Issue
In order to properly address the issues raised in this proceeding, it is vital for FERC to acknowledge the climate emergency and the agency’s statutory mandate to play a vital leadership role in addressing this issue. This Addendum addresses these matters.
A. The Climate Crisis is an Emergency Requiring Urgent Action to Reduce
Greenhouse Gases from the Power Sector.
The scientific community is unequivocal in its assessment that human activity is the primary driver of climate change, and that without decisive, coordinated efforts to reduce greenhouse gas emissions, its impacts will continue to cause extensive and far-reaching harm across the globe. As the most recent Assessment Report from the Intergovernmental Panel on Climate Change (IPCC) makes clear, fossil-fuel driven climate change is a “code red for humanity,” and every additional ton of CO2 and fraction of a degree of temperature rise matters.84
With the 1.5°C target set by the Paris Climate Agreement rapidly slipping out of reach, the potential trajectories of the nation’s climate future are becoming ever more concrete—and increasingly alarming. Extreme heat events will become significantly more frequent and severe, straining energy systems, threatening public health, and disproportionately impacting vulnerable communities and species.85 Sea-level rise and intensified coastal storms will endanger critical
84 United Nations Secretary-General, Secretary-General’s statement on the IPCC Working Group 1 Report on the Physical Science Basis of the Sixth Assessment, (Aug. 9, 2021), https://www.un.org/sg/en/content/secretary- generals-statement-the-ipcc-working-group-1-report-the-physical-science-basis-of-the-sixth-assessment.85 Wagner, A., Climate-driven extreme heat may make parts of Earth too hot for humans, Penn State University (Oct. 9, 2023), https://www.psu.edu/news/health-and-human-development/story/climate-driven-extreme-heat-may- make-parts-earth-too-hot-humans.
31
resulting climate change estimated the costs already exceed $800 billion per year and are expected to become even more expensive without rapid action to curb fossil fuel pollution.92 Climate change poses particularly severe threats to environmental justice communities, who are on the front lines of the climate emergency, and disproportionately bear the burden of utilities’ and other corporations’ failure to sufficiently account for and address climate change- related risks.93 It also poses additional risks to other communities, including children, older adults, immigrant groups, and persons with disabilities and pre-existing medical conditions.94 The IPCC Sixth Assessment makes clear that there is “a rapidly closing window of opportunity to secure a livable and sustainable future for all” and taking action now to reduce the country’s greenhouse gas emissions is the only pathway forward.95 The IPCC Sixth Assessment also finds—with high confidence—that continued greenhouse gas emissions at current levels will
92 Medical Society Consortium on Climate and Health, The Costs of Inaction: The Economic Burden of Fossil Fuels and Climate Change on Health in the United States (2021), https://medsocietiesforclimatehealth.org/wp- content/uploads/2021/05/CostofInactionReport-May2021.pdf at 5.93 E.g. Carina J. Gronlund, Racial and Socioeconomic Disparities in Heat-Related Health Effects and Their Mechanisms: a review, Curr. Epidemiol. Rep. 1 (3): 165-173 (2014) at https://www.ncbi.nlm.nih.gov/pmc/articles/PMC4264980/; R. Dean Hardy, Richard A. Milligan, and Nik Heynen, Injustice of Colorblind Adaptation Planning for Sea-Level Rise, Geoforum, 87: 62-72 (2017) at (https://www.sciencedirect.com/science/article/pii/S0016718517302944; NAACP, Environmental and Climate Justice, at https://www.naacp.org/issues/environmental-justice/. We use the term “environmental justice communities”' in accordance with the definition provided by the White House Environmental Justice Advisory Council (“WHEJAC”), which defines the term as “a geographic location with significant representation of persons of color, low-income persons, indigenous persons, or members of Tribal nations, where such persons experience, or are at risk of experiencing, higher or more adverse human health or environmental outcomes.” White House Env’tal Justice Advisory Council, 79 (May 21, 2021), WHEJAC Final Report Executive Order 14008, https://www.epa.gov./sites/production/files/2021-05/documents/whiteh2.pdf .94 NCA4, Vol. II, at 540, 548; U.S. Global Change Research Program, The Impacts of Climate Change on Human Health in the United States: A Scientific Assessment (2016); see also Nick Watts, et al., Health and Climate Change: Policy Responses to Protect Public Health, 386 The Lancet 1861 (2015) at 1861.95 IPCC, 2023: Sections. In: Climate Change 2023: Synthesis Report. Contribution of Working Groups I, II and III to the Sixth Assessment Report of the Intergovernmental Panel on Climate Change [Core Writing Team, H. Lee and J. Romero (eds.)]. IPCC, Geneva, Switzerland, p. 88.
PDF page 32
32
lock in highly damaging and irreversible changes to the climate for hundreds to thousands of years.96
The global average atmospheric carbon dioxide in 2024 was 424.61 parts per million (ppm), a level not seen for millions of years.97 The last time CO2 in the Earth’s atmosphere was at 400 ppm, global mean surface temperatures were 2 to 3°C warmer and the Greenland and West Antarctic ice sheets melted, leading to sea levels that were 10 to 20 meters higher than today.98 Global carbon emissions over the past 15 to 20 years have tracked the highest emission scenario used in IPCC climate projections, the RCP8.5 scenario,99 which is projected to lead to devastating impacts.100
In light of the climate emergency, the IPCC has emphasized the urgent need for “rapid and far-reaching transitions” across all sectors including electricity generation.101 Indeed, a critical feature of 1.5°C-consistent pathways is that the power sector must be significantly clean by 2030 and achieve “virtually full decarbonisation” by around mid-century.10296 IPCC, 2023: Sections. In: Climate Change 2023: Synthesis Report. Contribution of Working Groups I, II and III to the Sixth Assessment Report of the Intergovernmental Panel on Climate Change [Core Writing Team, H. Lee and J. Romero (eds.)]. IPCC, Geneva, Switzerland, p. 69.97 Statista, Average monthly carbon dioxide (CO₂) levels in the atmosphere worldwide from 1990 to 2025 (Mar. 25, 2025), https://www.statista.com/statistics/1091999/atmospheric-concentration-of-co2-historic/.98Corinne Le Quéré, et al., Global Carbon Budget 2018, 10 Earth Syst. Sci. Data 2141 (2018); World Meteorological Organization, WMO Greenhouse Gas Bulletin, No. 13, Oct. 30, 2017 at 5.99 NCA4, Vol. I at 31, 133-34, and 152 ( “The observed increase in global carbon emissions over the past 15–20 years has been consistent with higher scenarios (such as RCP8.5) (very high confidence)”).100 IPCC, Climate Change 2014: Synthesis Report. Contribution of Working Groups I, II and III to the Fifth Assessment Report of the IPCC (2014) at Figure 2.1.101 Id. at 15.102 IPCC Special Report, at 112.
PDF page 33
33
The U.S. is the world’s largest historic emitter of GHG pollution and is the world’s
second highest emitter on an annual and per capita basis.103 Scientific studies have estimated the remaining U.S. carbon budget consistent with the 1.5°C Paris Agreement target is approximately 25 gigatons (Gt) CO2 equivalent (CO2eq) to 57 GtCO2eq on average,104 depending on the equity principles used to apportion the global budget across countries.105 As the U.S. emits around 6 GtCO2eq each year, the remaining U.S. carbon budget compatible with the Paris Agreement’s climate targets is extremely small and is rapidly being expended, highlighting the urgent need for the U.S. to transition from fossil fuels to renewable energy.
In 2022, the electricity sector accounted for 33 percent of the United States’s total energy- related CO2 emissions, with 53 percent of emissions from coal, 44 percent from gas, and 2 percent from petroleum.106 The power sector therefore has a unique responsibility to decarbonize
103 Corinne LeQuéré, Corinne et al., Global Carbon Budget 2018, 10 Earth Sys. Sci. Data 2141, 2161 fig. 5 (2018); Global Carbon Project, Global Carbon Budget 2018, 19 (Dec. 5, 2018), https://www.globalcarbonproject.org/carbonbudget/archive/2018/GCP_CarbonBudget_2018.pdf (Historical cumulative fossil CO2 emissions by country).104 Yann Robiou du Pont, et al., Equitable Mitigation to Achieve the Paris Agreement Goals, 7 Nature Climate Change 38 (2017), and Supplemental Tables 1 and 2. Quantities measured in GtCO2eq include the mass emissions from CO2 as well as the other well-mixed GHGs (CO2, methane, nitrous oxide, hydrofluorocarbons, perfluorocarbons and SF6) converted into CO2-equivalent values, while quantities measured in GtCO2 refer to mass emissions of just CO2 itself.105 Robiou du Pont, et al. (2017) averaged across IPCC sharing principles to estimate the U.S. carbon budget from 2010 to 2100 for a 50 percent chance of returning global average temperature rise to 1.5°C by 2100, based on a cost- optimal model. The study estimated the U.S. carbon budget consistent with a 1.5°C target at 25 GtCO2eq by averaging across four equity principles: capability (83 GtCO2eq), equal per capita (118 GtCO2eq), greenhouse development rights (-69 GtCO2eq), and equal cumulative per capita (-32 GtCO2eq). The study estimated the U.S. budget at 57 GtCO2eq when averaging across five sharing principles, adding the constant emissions ratio (186 GtCO2eq) to the four above-mentioned principles. However, the constant emissions ratio, which maintains current emissions ratios, is not considered to be an equitable sharing principle because it is a grandfathering approach that “privileges today’s high-emitting countries when allocating future emission entitlements.”106 How much of U.S. carbon dioxide emissions are associated with electricity generation? U.S. EIA, (Nov. 30, 2023), https://www.eia.gov/tools/faqs/faq.php?id=77&t=11.
PDF page 34
34
all operations and shift away from the fossil fuel energy harming marginalized and vulnerable communities, as well as species.
B. The Commission Has a Mandate to Facilitate the Nation’s Clean Energy
Transition.
Congress has directed that FERC make the Nation’s transition away from fossil fuel power sources a high priority. In the Energy Act of 2020 Congress set forth a national goal “to reduce emissions and meet 100 percent of the power demand in the United States through clean, renewable, or zero emission energy sources . . . .”107 Given FERC’s vital role in overseeing the Nation’s power sector, this provision demonstrates a Congressional expectation for FERC to incorporate decarbonization into all its decision-making.
This is not a new Congressional priority. More than forty years ago, Congress passed the Public Utility Regulatory Policies Act (PURPA), directing FERC to reduce the nation’s reliance on fossil fuels, and charging the agency with administering new programs to foster the development of renewable energy resources.108 Thus, as the Supreme Court has explained, in considering the use of the term “public interest,” FERC is called upon to consider the objective to “reduce reliance on fossil fuels,” based on the fundamental premise that the country benefits from renewable energy development and the “resulting decrease in the Nation’s dependence on fossil fuels.”109
Making decarbonization, as well as larger questions of energy justice, a central priority at FERC is also entirely consistent with the remainder of FERC’s statutory mandates. As former
107 Pub. L. No. 116-260, Division Z, § 11003 (2020) (emphasis added).108 Public Utility Regulatory Policies Act, Pub. L. No. 95–617, 92 Stat. 3117 (1978).109 American Paper Inst. v. Am. Elec. Power Serv. Corp., 461 U.S. 402, 417-418 (1983) (emphasis added).
PDF page 35
35
Chairman Glick explained, the agency is charged with making decisions that comport with the public interest, and “it is hard to imagine a consideration more relevant to the ‘public interest’ than the existential threat posed by climate change.”110 Moreover, as noted, in one of the few cases to address the definition of “public interest” on a federal level, the U.S. Supreme Court noted the agency’s broad authority to pursue appropriate public interest objectives, including environmental and conservation objectives.111
Accordingly, we urge FERC to affirmatively prioritize the goal of rapid decarbonization into all facets of the transmission planning process.
110 Rich Glick and Matthew Christiansen, FERC and Climate Change, 40 Energy L. J. 1, 6 (2019).111 National Association for the Advancement of Colored People v. Federal Power Commission, 425 U.S. 662 (1976).