EL25-49-000 · 2025-04-09 · Talen Energy Corporation

Answer of Talen Energy Corporation in Opposition to Vistra Corp.'s Motion for Clarification and Request for Expedited Treatment

Text extracted from the eLibrary original (SHA-256 f38c50222cc4da36…). Download the original from the official source.

Contents · 2 sections
  1. I. ANSWER p. 2
  2. II. CONCLUSION p. 3

Read topic-matched comments in EL25-49

Topics in the text: Filing procedure · Connecting load and generation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Filing procedure

EL25-49-000 (the “Co-Location Show Cause Docket”) requests that the Commission act on a narrow subset of the issues raised in Talen’s Request for Rehearing and closely mirrors the issues Vistra raised in the Motion for Clarification it filed in the SSES ISA Docket.3 With respect, the Commission…
Read this passage Filed comments: Filing procedure

I. ANSWER

printed heading · Topic match: Filing procedure

Federal Energy Regulatory Commission, No. 25-60019 (5th Cir. 2025). 5 See generally Request for Rehearing, 6 Id. at 8-12. 7 Id. 8 Vistra requests the Commission to clarify that “the Susquehanna ISO Order should not be read to (1) prejudge the permissibility of any particular co-location…
Read this passage Filed comments: Filing procedure

II. CONCLUSION

printed heading · Topic match: Connecting load and generation

CONCLUSION For the aforementioned reasons, we respectfully ask the Commission to deny Vistra’s motion and provide the relief Talen requests.
Read this passage Filed comments: Connecting load and generation

CERTIFICATE OF SERVICE

printed heading

Dated at Washington, DC, this 9th day of April 2025. /s/ Melinda J.