EL26-67-000 · 2026-11-19 · Individual No Affiliation

Comments of Olabanji John Ogunyemi in response to the 06/18/2026 Show Cause Order

Text extracted from the eLibrary original (SHA-256 1472e04642aaa1c3…). Download the original from the official source.

Contents · 9 sections
  1. I. INTEREST OF THE COMMENTER p. 1
  2. II. SUMMARY p. 2
  3. III. COMMENTS p. 2
  4. A. Study procedures should have defined timelines, because federal law now fixes a p. 2
  5. B. Cost transparency should extend to estimates that capital providers can rely on p. 3
  6. C. Clear services for flexible large loads would support storage financed alongside p. 3
  7. D. Terms for generation serving electrically proximate or co-located load should be set p. 4
  8. E. PJM's assessment of adequate generation should reflect delivered output (Show p. 4
  9. IV. CONCLUSION p. 4

Read topic-matched comments in EL26-67

Topics in the text: Connecting load and generation · Cost allocation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Cost allocation

On June 18, 2026, the Commission directed PJM Interconnection, L.L.C. (PJM) and the PJM Transmission Owners to show cause why PJM's Open Access Transmission Tariff remains just and reasonable without provisions addressing (a) the application process, study procedures and operational requirements…
Read this passage Filed comments: Cost allocation

I. INTEREST OF THE COMMENTER

printed heading

My experience is with distribution- 1 connected projects in the Midwest and New England, outside the PJM region, but the financing tests these projects must pass are the same nationwide.
Read this passage

II. SUMMARY

printed heading

SUMMARY Much of the new generation that will serve large loads, including data centers, will be solar and battery storage, because those resources can be built fastest.
Read this passage

III. COMMENTS

printed heading

III.
Read this passage

A. Study procedures should have defined timelines, because federal law now fixes a

printed heading

Study procedures should have defined timelines, because federal law now fixes a completion deadline for solar (Show Cause Order P 3(a)).
Read this passage

B. Cost transparency should extend to estimates that capital providers can rely on

printed heading · Topic match: Cost allocation

I support the Commission's focus on transparency of Network Upgrade costs and on a pro forma cost recovery agreement to mitigate cost shifting.
Read this passage Filed comments: Cost allocation

C. Clear services for flexible large loads would support storage financed alongside

printed heading

Clear services for flexible large loads would support storage financed alongside them (Show Cause Order P 3(c)).
Read this passage

D. Terms for generation serving electrically proximate or co-located load should be set

printed heading · Topic match: Connecting load and generation

Terms for generation serving electrically proximate or co-located load should be set out in the Tariff (Show Cause Order P 3(d)).
Read this passage Filed comments: Connecting load and generation

E. PJM's assessment of adequate generation should reflect delivered output (Show

printed heading

PJM's assessment of adequate generation should reflect delivered output (Show Cause Order P 4).
Read this passage

IV. CONCLUSION

printed heading · Topic match: Connecting load and generation

I respectfully urge the Commission to direct PJM to adopt Tariff provisions that give large loads and the generation serving them (i) study procedures with defined timelines, (ii) cost estimates that capital providers can rely on, (iii) clear services for flexible large loads paired with storage,…
Read this passage Filed comments: Connecting load and generation