ER26-3552-000 · 2026-09-08 · Advanced Energy United

Comments of Advanced Energy United in response to the Midcontinent Independent System Operator’s proposal to establish a Zero Injection Generator…

Text extracted from the eLibrary original (SHA-256 d560b04146f87179…). Download the original from the official source.

Contents · 2 sections
  1. Background
  2. Conclusion

Read topic-matched comments in ER26-3552

Topics in the text: Connecting load and generation · Cost allocation · Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Connecting load and generation

These provisions will help to ensure just and reasonable rates for customers and maintain system reliability, consistent with Section 205 of the FPA.[fn:5] For these reasons, United requests that the Commission accept the proposed revisions.
Read this passage Filed comments: Connecting load and generation

Background

printed heading · Topic match: Connecting load and generation

At a minimum, MISO should develop queue coordination rules that: (i) detail when a project must exit one process and commit to the other, like the safeguards already in place between the ZGIA and DPP; (ii) define a point in the LARS study process, analogous to DPP's Decision Point II, beyond which…
Read this passage Filed comments: Connecting load and generation

Conclusion

printed heading

Conclusion For the reasons stated above, Advanced Energy United respectfully requests that the Commission consider these comments and accept MISO’s proposed ZGIA framework to facilitate speed-to-power for co-located generation and load configurations while maintaining system reliability and…
Read this passage

CERTIFICATE OF SERVICE

printed heading

Dated this 8th day of September 2026. /s/ Kelsey Koenig
Read this passage

Footnotes

Word notes · Topic match: Cost allocation

Comm’n., Notice of Extension of Time re PJM Interconnection, L.L.C., Docket No.
Read this passage Filed comments: Cost allocation