EL25-49-000 · 2026-11-18 · PJM Interconnection L.L.C

PJM Interconnection L.L.C. submits Notice of Filing related to the 11/16/2026 Proposal to Address Operational Requirements for Large Computational Load and…

Text extracted from the eLibrary original (SHA-256 7b718bbd5b04efb0…). Download the original from the official source.

Read topic-matched comments in EL25-49

Topics in the text: Connecting load and generation · Filing procedure

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Connecting load and generation

ER27-531-000, PJM filed its Fast Energization Process and new Transmission Services proposal in response to the Commission’s large load show cause order and in partial compliance with the co-located load order.
Read this passage Filed comments: Connecting load and generation

CERTIFICATE OF SERVICE

printed heading

Dated at Audubon, PA, this 18th day of November, 2026. /s/ Mark J.