PJM Interconnection L.L.C. submits Notice of Filing related to the 11/16/2026 Proposal to Address Operational Requirements for Large Computational Load and…
PDF page 1
PJM Interconnection, L.L.C.
2750 Monroe Blvd.
Audubon, PA 19403
Mark J. Stanisz
Associate General Counsel
T: (610) 666-4707
mark.stanisz@pjm.com
November 18, 2026
The Honorable Debbie-Anne A. Reese
Secretary
Federal Energy Regulatory Commission
888 First Street, N.E.
Washington, D.C. 20426-0001
Re:
PJM Interconnection, L.L.C., et al. Docket No. EL26-67-000 PJM Interconnection, L.L.C., Docket Nos. EL25-49, et al. Large Loads Co-Located at Generating Facilities, Docket No. AD24-11-000 Constellation Energy Generation, LLC v. PJM Interconnection, L.L.C., Docket No. EL25-20-000
PJM Interconnection, L.L.C., Docket No. ER26-1479-000 Exelon Corporation, et al. Docket No. ER26-3537-000
Notice of Filing
Dear Secretary Reese:
This notice, being served on all parties to the above-referenced proceedings, confirms that on November 16, 2026, PJM Interconnection, L.L.C. made the following submissions: Title
Docket
No.
Description
PJM Proposal to Address
Operational
Requirements for Large
Computational Load and
Establish
an
Annual
Transmission
Service
Reporting Requirement
ER27-522-
000
On November 16, 2026, in Docket No. ER27-522-000, PJM submitted proposed Tariff revisions regarding ride-through requirements for Large Computational Load, other operational requirements, and an annual transmission service reporting requirement. PJM requested that the Tariff revisions become effective January 16, 2027.
PJM Proposed Tariff
Revisions to Establish
the Fast Energization
Process
and
New
Transmission
Services
Pursuant to Section 205
of the Federal Power Act
ER27-531-
000
On November 16, 2026, in Docket No. ER27-531-000, PJM filed its Fast Energization Process and new Transmission Services proposal in response to the Commission’s large load show cause order and in partial compliance with the co-located load order. PJM seeks a 60 day comment period, and requested a March 16, 2027 effective date for some of its filing, and an indeterminate effective date for those parts of the filing relating to the new planning processes.
PDF page 2
Honorable Debbie-Anne A. Reese, Secretary
November 18, 2026
Page 2
2
and on Compliance with
the Co-Located Load
Compliance Directives
Motion to Withdraw Co-
Located
Load
Compliance
Filing
Given
Overlapping
Filing in Docket No.
ER27-531-000
ER26-
1479-002
On November 16, 2026, in Docket No. ER26-1479-002, PJM
filed a motion to withdraw the August 17, 2026 co-located load
compliance filing and terminate Docket No. ER26-1479-002
given the filing in Docket No. ER27-531. Motion answers due
December 1, 2026. 18 CFR § 385.213(d)(1).
As explained in these submissions, the new and revised tariff records submitted in Docket Nos. ER27-522-000 and ER27-531-000 are responsive to and consistent with the preliminary findings made by the Commission in its June 18, 2026 Order Instituting Proceeding Under Section 206 of the Federal Power Act in Docket No. EL26-67-000,1 and also comply with the Commission’s June 18, 2026 Order on Rehearing, Clarification, Compliance Filing and Paper Hearing in Docket Nos. EL25-49, et al.2
Respectfully submitted,
/s/ Mark J. Stanisz
Mark Stanisz
Associate General Counsel
PJM Interconnection, L.L.C.
2750 Monroe Boulevard
Audubon, PA 19403
(610) 666-2255
mark.stanisz@pjm.com
On behalf of
PJM Interconnection, L.L.C.
1 PJM Interconnection, L.L.C., 195 FERC ¶ 61,211 at PP 35, 41-101 (2026), errata notice, 196 FERC ¶ 61,122 (2026).
2 PJM Interconnection, L.L.C., 195 FERC ¶ 61,209 (2026).
PDF page 3
CERTIFICATE OF SERVICE
I hereby certify that I have this day served the foregoing document upon each person designated on the official service list compiled by the Secretary in these proceedings.
Dated at Audubon, PA, this 18th day of November, 2026.
/s/ Mark J. Stanisz
Mark J. Stanisz
Associate General Counsel
PJM Interconnection, L.L.C.
2750 Monroe Blvd.
Audubon, PA 19403
(610) 666-4707
Mark.Stanisz@pjm.com
Attorney for
PJM Interconnection, L.L.C.