ER27-532-000 · 2026-11-16 · California Independent System Operator Corporation

Att-D_Large-Load-Straw-Proposal

Text extracted from the eLibrary original (SHA-256 1239690bc860eb78…). Download the original from the official source.

Read the parent filing

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Attachment D – Technical Working Group Proposal

printed heading

Attachment D – Technical Working Group Proposal Large Loads Tariff Amendment California Independent System Operator Corporation November 16, 2026 Large Load Technical Requirements Straw Proposal Large Load Technical Requirements Working Group California ISO Gridliance West LLC Pacific Gas and…
Read this passage

Table of Contents

printed heading

Table 1: Frequency Ride-through Capability Requirements Frequency (Hz) Minimum Ride-through Requirement (sec) >61.8 May trip >61.2 299 ≤ 61.2 and ≥ 58.8 Continuous operation <58.8 299 <57.0 May trip Notes • Frequency measurements shall be taken at the high side of the main power transformer (MPT).…
Read this passage