ER26-3380-000 · 2026-09-02 · Kentucky Attorney General

Motion for Leave to Answer and Answer of the Attorney General of the Commonwealth of Kentucky to the comments and protests of PJM Interconnections, L.L.C.’s…

Text extracted from the eLibrary original (SHA-256 68fdb98af2b5463d…). Download the original from the official source.

Contents · 2 sections
  1. I. MOTION FOR LEAVE TO ANSWER p. 1
  2. II. COMMENTS p. 2

Read topic-matched comments in ER26-3380

Topics in the text: Cost allocation · Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C.
Read this passage

I. MOTION FOR LEAVE TO ANSWER

printed heading · Topic match: Cost allocation

The Kentucky Attorney General is authorized by statute to represent the interests of ratepayers in the Commonwealth of Kentucky and through this Answer offers its comments on the comments on and protests of the PJM Reliability Backstop Procurement (“RBP”) Filing.4 Good cause justifies the…
Read this passage Filed comments: Cost allocation

II. COMMENTS

printed heading · Topic match: Cost allocation

Importantly, doing otherwise would run afoul of the President’s Ratepayer Protection Pledge, which prohibits such cost shifting.8 FERC simply must not allow the RBP to proceed unless reasonable assurance is provided that Kentucky ratepayers will be held harmless from the costs caused by others,…
Read this passage Filed comments: Cost allocation