AD26-7-000 · 2026-08-21 · Individual No Affiliation

Comment of Terry Headley in Docket(s)/Project(s) AD26-7-000 Submission Date: 8/21/2026

Text extracted from the eLibrary original (SHA-256 4d9f682eb5c21648…). Download the original from the official source.

Contents · 11 sections
  1. I. INTRODUCTION AND SUMMARY OF POSITION
  2. II. STATEMENT OF INTEREST AND COMMUNICATIONS
  3. III. THE STANDARD THE COMMISSION SHOULD APPLY
  4. IV. BOARD AUTHORITY, INDEPENDENCE, AND ACCOUNTABILITY
  5. V. SECTION 205 FILING RIGHTS AND DOCUMENT ARCHITECTURE
  6. VI. THE ROLE OF THE STATES
  7. VII. STAKEHOLDER PROCESS DESIGN, VOTING, AND TRANSPARENCY
  8. VIII. THE MISSING MEASUREMENT: UTILIZATION OF EXISTING CAPACITY
  9. IX. STRUCTURAL SCOPE, EXIT RIGHTS, AND THE ENFORCEABLE BACKSTOP
  10. X. SUMMARY OF RECOMMENDATIONS
  11. XI. CONCLUSION

Read topic-matched comments in AD26-7

Topics in the text: Reliability and curtailment · Registry access · Cost allocation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

Government and regulatory submission portals are notorious for stripping out formatting like bold text, bullet points, and tables, which can turn a well-structured document into an unreadable wall of text.
Read this passage

I. INTRODUCTION AND SUMMARY OF POSITION

printed heading · Topic match: Reliability and curtailment

Board independence must be permanently tethered to accountability.
Read this passage Filed comments: Reliability and curtailment

II. STATEMENT OF INTEREST AND COMMUNICATIONS

printed heading · Topic match: Reliability and curtailment

STATEMENT OF INTEREST AND COMMUNICATIONS The Seneca Center is a 501(c)(3) nonprofit researching electricity market design, resource adequacy, and dispatch economics.
Read this passage Filed comments: Reliability and curtailment

III. THE STANDARD THE COMMISSION SHOULD APPLY

printed heading

THE STANDARD THE COMMISSION SHOULD APPLY Chairman Swett and Deputy Secretary Danly accurately diagnosed PJM's grave legitimacy crisis, a physical problem with a procedural cause.
Read this passage

IV. BOARD AUTHORITY, INDEPENDENCE, AND ACCOUNTABILITY

printed heading

Expanded board authority must include: A codified public interest mandate in governing documents running directly to retail consumers.
Read this passage

V. SECTION 205 FILING RIGHTS AND DOCUMENT ARCHITECTURE

printed heading

SECTION 205 FILING RIGHTS AND DOCUMENT ARCHITECTURE PJM proposes moving Operating Agreement Schedules 1 and 6 to the Tariff, granting it unilateral Section 205 authority.
Read this passage

VI. THE ROLE OF THE STATES

printed heading · Topic match: Reliability and curtailment

THE ROLE OF THE STATES The central governance defect in PJM is a federalism problem: states bear responsibility for resource adequacy and retail rates but lack structural power.
Read this passage Filed comments: Reliability and curtailment

VII. STAKEHOLDER PROCESS DESIGN, VOTING, AND TRANSPARENCY

printed heading · Topic match: Registry access

We also support increasing the sector weight for state consumer advocates.
Read this passage Filed comments: Registry access

VIII. THE MISSING MEASUREMENT: UTILIZATION OF EXISTING CAPACITY

printed heading · Topic match: Cost allocation

It must identify economically available, undispatched firm capacity during peak load events and the cost of replacement energy procured in its place.
Read this passage Filed comments: Cost allocation

IX. STRUCTURAL SCOPE, EXIT RIGHTS, AND THE ENFORCEABLE BACKSTOP

printed heading

A Date Certain: The Commission must establish March 31, 2027, as the absolute deadline for a Section 205 reform package.
Read this passage

X. SUMMARY OF RECOMMENDATIONS

printed heading · Topic match: Registry access

SUMMARY OF RECOMMENDATIONS Codify an Order No. 2000 public interest duty to retail consumers.
Read this passage Filed comments: Registry access

XI. CONCLUSION

printed heading

CONCLUSION The Appalachian and Ohio Valley communities will measure the outcome of this proceeding against one question: whether the lights stay on and what it costs.
Read this passage