EL25-49-000 · 2026-04-24 · Indicated PJM Transmission Owners

Exhibit No. PTO-0005 – Joint Rebuttal Testimony of Blazunas, Schafer, & Hammer

Text extracted from the eLibrary original (SHA-256 0cad5d1a41125a9f…). Download the original from the official source.

Contents · 5 sections
  1. I. INTRODUCTION p. 1
  2. II. BACKGROUND p. 2
  3. III. PURPOSE OF TESTIMONY p. 3
  4. IV. FINANCIAL PENALTY PROPOSAL p. 4
  5. V. GRID RELIANCE CHARGE p. 16

Read the parent filing

Read topic-matched comments in EL25-49

Topics in the text: Connecting load and generation · Cost allocation · Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword. Pages with no text layer: 33.

Opening text

opening text

PTO-0005 Page 1 of 31 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C., et al. ) Docket No.
Read this passage

I. INTRODUCTION

printed heading

Please state your name, title, business address, and provide your professional 2 background and relevant experience. 3 A. [Blazunas] My name is Peter Blazunas, and my business address is 293 Boston Post Road 4 West, Marlborough, MA 01752.
Read this passage

II. BACKGROUND

printed heading · Topic match: Connecting load and generation

What is the background for this proceeding? 9 A. [Blazunas, Schafer, and Hammer] On December 18, 2025, the Commission issued its 10 order in PJM Interconnection, L.L.C., 193 FERC ¶ 61,217, at P 193 (2025) (“Order”).
Read this passage Filed comments: Connecting load and generation

III. PURPOSE OF TESTIMONY

printed heading · Topic match: Connecting load and generation

First, we 9 provide additional detail regarding a proposal to impose financial penalties for Eligible 10 Customers3 taking service on behalf of Co-Located Load that make unreserved use of the 11 transmission system.
Read this passage Filed comments: Connecting load and generation

IV. FINANCIAL PENALTY PROPOSAL

printed heading · Topic match: Connecting load and generation

First, and most importantly, any penalties must be sufficient 9 to meaningfully deter Co-Located Load customers from exceeding their contract demand 10 or Interim NITS limits and making unreserved use of the transmission system.
Read this passage Filed comments: Connecting load and generation

V. GRID RELIANCE CHARGE

printed heading · Topic match: Cost allocation

Ming proposes to apply the results of his transmission minimum system 10 study directly to the NITS rate, is he violating cost causation principles that he 11 describes in his testimony? 12 A. [Schafer] Yes.
Read this passage Filed comments: Cost allocation