ER26-3531-000 · 2026-10-15 · Office of Energy Market Regulation

Letter informing American Transmission Company LLC that the 08/17/2026 filing is deficient and requesting additional information within 60 days

Text extracted from the eLibrary original (SHA-256 90632f64ab8b3c6a…). Download the original from the official source.

Read topic-matched comments in ER26-3531

Topics in the text: Cost allocation · Filing procedure

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Cost allocation

Proposed section VI.A.5 (ATCLLC Large Load Distribution-Transmission Interconnection Study Request Charge) of Attachment FF-ATCLLC states that a Distribution Customer requesting to interconnect an ATC Large Load shall pay an initial deposit in an amount set forth in the applicable ATC Business…
Read this passage Filed comments: Cost allocation

Footnotes

Word notes

FF-ATCLLC, § IV (Definitions) (32.0.0). [fn:12] ATC proposes to define a Distribution Interconnection as: the point at which the Transmission Facilities owned by ATCLLC that operate at 50 kV and above interconnect to the Distribution Facilities owned by others that operate at a voltage below 50 kV…
Read this passage