Post-Conference Comments of American Municipal Power, Inc. on the issues addressed at the 07/23/2026 technical conference re PJM Governance and Stakeholder…
Text extracted from the eLibrary original (SHA-256 99f5af13fe89b50e…). Download the original from the official source.
Contents · 8 sections
- I. COMMENTS
- A. It is essential to identify the problems we are trying to solve.
- B. PJM could meaningfully improve the stakeholder process through
- C. Enhanced state input is desirable.
- D. Concerns about PJM Board independence and transparency should
- E. FPA section 205 filing rights are not the problem.
- II. RESPONSE TO SPECIFIC QUESTIONS
- III. CONCLUSION
Read topic-matched comments in AD26-7
Topics in the text: Reliability and curtailment · Cost allocation · Registry access
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Governance and Stakeholder Reforms ) Docket No.Read this passage
I. COMMENTS
printed heading
I.Read this passage
A. It is essential to identify the problems we are trying to solve.
printed heading · Topic match: Reliability and curtailment
AD26-7-000, at p. 9 (July 16, 2026). 5 See, e.g., PJM Interconnection, L.L.C., 195 FERC ¶ 61,076 (2026) (accepting PJM FPA section 205 filing to amend the PJM Tariff to extend a price collar for certain Reliability Pricing Model (“RPM”) auctions); PJM Interconnection, L.L.C., 190 FERC ¶ 61,117,…Read this passage Filed comments: Reliability and curtailment
B. PJM could meaningfully improve the stakeholder process through
printed heading
PJM could meaningfully improve the stakeholder process through better issue prioritization and other straightforward reforms.Read this passage
C. Enhanced state input is desirable.
printed heading
AMP supports enhancing state input into the PJM stakeholder process.Read this passage
D. Concerns about PJM Board independence and transparency should
printed heading
In considering any such changes, moreover, PJM, stakeholders, and the Commission must ensure that Board independence is balanced against the need for responsiveness to stakeholder concerns, as required by Order No. 719.8Read this passage
E. FPA section 205 filing rights are not the problem.
printed heading · Topic match: Reliability and curtailment
Mkts., Order No. 719, 125 FERC ¶ 61,071, at PP 502-503 (2008), order on reh'g, Order No. 719-A, 128 FERC ¶ 61,059, order on reh'g, Order No. 719-B, 129 FERC ¶ 61,252 (2009). 6 would enhance the RTO’s ability to tackle its looming resource adequacy and affordability crises more effectively.Read this passage Filed comments: Reliability and curtailment
II. RESPONSE TO SPECIFIC QUESTIONS
printed heading · Topic match: Cost allocation
But any such performance assessment framework must be carefully designed to avoid misaligned incentives.Read this passage Filed comments: Cost allocation
III. CONCLUSION
printed heading
CONCLUSION American Municipal Power, Inc. requests that the Commission consider the forgoing comments in taking any further action in this proceeding.Read this passage
CERTIFICATE OF SERVICE
printed heading
Dated at Washington, D.C., this 21st day of August, 2026. /s/ John McCaffrey John McCaffrey Stinson LLP 1775 Pennsylvania Avenue NW Suite 800 Washington, DC 20006 (202) 728-3026 john.mccaffrey@stinson.comRead this passage