ER26-3380-000 · 2026-07-31 · PJM Interconnection, L.L.C.

Attachment B - Clean Tariff Records.pdf

Contents · 10 sections
  1. Attachment B p. 1
  2. Attachment K-Appendix, section 1.4B. p. 18
  3. Attachment K-Appendix, section 1.5A, to participate in the PJM Interchange Energy Market p. 21
  4. Attachment K-Appendix, section 6.6(c) or the defaults below: p. 58
  5. A. The Capacity Market Seller shall provide to the Office of the p. 65
  6. B. The Office of the Interconnection and the Market Monitoring Unit shall p. 65
  7. A. It has a documented plan in place to retire the resource prior to or during the Delivery p. 93
  8. B. Significant physical operational restrictions cause long term or permanent changes to the p. 93
  9. C. The Capacity Market Seller is involved in an ongoing regulatory proceeding (e.g. – p. 93
  10. D. FRR Capacity Plans p. 161

Read the parent filing

Read topic-matched comments in ER26-3380

Topics in the text: Credit and exit · Cost allocation · Connecting load and generation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Attachment B

printed heading · Topic match: Credit and exit

Collateral Call: “Collateral Call” shall mean a notice to a Participant that additional Collateral, or possibly early payment, is required in order to remain in, or to regain, compliance with Tariff, Attachment Q.
Read this passage Filed comments: Credit and exit

Attachment K-Appendix, section 1.4B.

printed heading · Topic match: Reliability and curtailment

Direct Load Control: “Direct Load Control” shall mean load reduction that is controlled directly by the Curtailment Service Provider’s market operations center or its agent, in response to PJM instructions.
Read this passage Filed comments: Reliability and curtailment

Attachment K-Appendix, section 1.5A, to participate in the PJM Interchange Energy Market

printed heading · Topic match: Credit and exit

Entity Providing Supply Services to Default Retail Service Provider: “Entity Providing Supply Services to Default Retail Service Provider” shall mean any entity, including but not limited to a load aggregator or power marketer, providing supply services to an electric distribution company when that…
Read this passage Filed comments: Credit and exit

Attachment K-Appendix, section 6.6(c) or the defaults below:

printed heading · Topic match: Connecting load and generation

Surplus Interconnection Service: “Surplus Interconnection Service” shall mean any unneeded portion of Interconnection Service established in an Interconnection Service Agreement, such that if Surplus Interconnection Service is utilized, the total amount of Interconnection Service at the Point of…
Read this passage Filed comments: Connecting load and generation

A. The Capacity Market Seller shall provide to the Office of the

printed heading

The Capacity Market Seller shall provide to the Office of the Interconnection and the Market Monitoring Unit, upon their request, all supporting data and information requested by either the Office of the Interconnection or the Market Monitoring Unit to evaluate whether the underlying Capacity…
Read this passage

B. The Office of the Interconnection and the Market Monitoring Unit shall

printed heading · Topic match: Reliability and curtailment

The Office of the Interconnection and the Market Monitoring Unit shall review any requested supporting data and information, and the Office of the Interconnection, considering advice and recommendation from the Market Monitoring Unit, shall reject a request for a resource to offer as a Capacity…
Read this passage Filed comments: Reliability and curtailment

A. It has a documented plan in place to retire the resource prior to or during the Delivery

printed heading

It has a documented plan in place to retire the resource prior to or during the Delivery Year, and has submitted a notice of Deactivation to the Office of the Interconnection consistent with Tariff, Part V, section 113.1, without regard to whether the Office of the Interconnection has requested the…
Read this passage

B. Significant physical operational restrictions cause long term or permanent changes to the

printed heading

Significant physical operational restrictions cause long term or permanent changes to the installed capacity value of the resource, or the resource is under major repair that will extend into the applicable Delivery Year, that will result in the imposition of RPM performance penalties pursuant to…
Read this passage

C. The Capacity Market Seller is involved in an ongoing regulatory proceeding (e.g. –

printed heading · Topic match: Credit and exit

The Reliability Backstop Procurement credit requirements described herein shall be separate from and additional to any credit requirements for participation in RPM Auctions and bilateral transactions under Tariff, Attachment DD, section 4.6, and other market activity in the PJM Markets, as set…
Read this passage Filed comments: Credit and exit

D. FRR Capacity Plans

printed heading

Each FRR Entity shall submit its initial FRR Capacity Plan as required by subsection C.1 of this Schedule, and shall annually extend and update such plan by no later than one month prior to the Base Residual Auction for each succeeding Delivery Year in such plan.
Read this passage