EL25-49-000 · 2025-03-24 · Silver Run Electric, LLC

Answer of Silver Run Electric, LLC to the 02/20/2025 Order Instituting Proceeding Under Section 206 of the Federal Power Act

Text extracted from the eLibrary original (SHA-256 ecad773bdcd24132…). Download the original from the official source.

Contents · 3 sections
  1. I. BACKGROUND p. 1
  2. II. RESPONSE p. 2
  3. III. CONCLUSION p. 2

Read topic-matched comments in EL25-49

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

Secretary Federal Energy Regulatory Commission 888 First Street, N.E.
Read this passage

I. BACKGROUND

printed heading

Silver Run is an electric transmission-only utility company established to develop, own, and operate transmission facilities within the PJM region, and is organized under the laws of the State of Delaware.
Read this passage

II. RESPONSE

printed heading

RESPONSE Silver Run has carefully reviewed each of the issues raised in the February 20 Order, including the briefing questions reflected in Section VI.D of the February 20 Order.
Read this passage

III. CONCLUSION

printed heading

CONCLUSION Silver Run looks forward to the opportunity of working with the Commission, its staff, PJM, and other stakeholders in this proceeding on any Tariff revisions that the Commission may find are necessary.
Read this passage

CERTIFICATE OF SERVICE

printed heading

Dated at Washington, DC, this 24th day of March 2025. /s/ Seth Yeazel Seth Yeazel LS Power Development, LLC 16150 Main Circle Drive, Suite 310 Chesterfield, MO 63017 240-904-5109 syeazel@lspower.com