Comments of Energy Artisans, LLC re PJM Interconnection, L.L.C. Compliance Filing submitted on 02/23/2026
Text extracted from the eLibrary original (SHA-256 3dfea537dbf0432c…). Download the original from the official source.
Contents · 2 sections
Read topic-matched comments in ER26-1479
Topics in the text: Connecting load and generation · Reliability and curtailment · Filing procedure
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Connecting load and generation
ER26-1479-000) Date of Filing: February 23, 2026 Subject: Co-Located Load Related Revisions to Open Access Transmission TariffRead this passage Filed comments: Connecting load and generation
Introduction
printed heading · Topic match: Reliability and curtailment
While PJM ostensibly seeks to address reliability and resource adequacy risks pursuant to the Commission’s December 18, 2025, Order to Show Cause, the proposed revisions to the Open Access Transmission Tariff ("OATT") represent a fundamental misalignment of cost and benefit.Read this passage Filed comments: Reliability and curtailment
H. Bertram Wilson, CFA
printed heading
H.Read this passage