Non-Decisional: Emerald AI submits comment to FERC's Chairman and Commissioners regarding the FERC Co-Location Show Cause to PJM , (the two redactions…
Text extracted from the eLibrary original (SHA-256 fe8be34bc2940ed3…). Download the original from the official source.
Read topic-matched comments in EL25-49
Topics in the text: Reliability and curtailment · Connecting load and generation
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword. Pages with no text layer: 7.
Pages 1 to 4
page range · Topic match: Connecting load and generation
The diagram only contemplates that if there is a 100 MW firm service limit above which the grid offers no reliability, the customer must bring 900 MW of reliable onsite generation to fill the gap.Read this passage Filed comments: Connecting load and generation
Pages 5 to 7
page range · Topic match: Reliability and curtailment
Because the AI factory can modulate its consumption in real-time (seconds-based guaranteed curtailment response in furtherance of numerous system strength/grid need experiments), it provides a counter-flow effect at its specific node.Read this passage Filed comments: Reliability and curtailment