EL25-49-000 · 2026-01-16 · Emerald Ai

Non-Decisional: Emerald AI submits comment to FERC's Chairman and Commissioners regarding the FERC Co-Location Show Cause to PJM , (the two redactions…

Text extracted from the eLibrary original (SHA-256 fe8be34bc2940ed3…). Download the original from the official source.

Read topic-matched comments in EL25-49

Topics in the text: Reliability and curtailment · Connecting load and generation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword. Pages with no text layer: 7.

Pages 1 to 4

page range · Topic match: Connecting load and generation

The diagram only contemplates that if there is a 100 MW firm service limit above which the grid offers no reliability, the customer must bring 900 MW of reliable onsite generation to fill the gap.
Read this passage Filed comments: Connecting load and generation

Pages 5 to 7

page range · Topic match: Reliability and curtailment

Because the AI factory can modulate its consumption in real-time (seconds-based guaranteed curtailment response in furtherance of numerous system strength/grid need experiments), it provides a counter-flow effect at its specific node.
Read this passage Filed comments: Reliability and curtailment