Comments of Invenergy Renewables LLC et al. in response to PJM Interconnection, L.L.C.’s Initial Brief in the Order to Show Cause Proceeding and Compliance…
Text extracted from the eLibrary original (SHA-256 85c10d3f66bfb3a2…). Download the original from the official source.
Contents · 4 sections
Read topic-matched comments in EL25-49
Topics in the text: Connecting load and generation · Cost allocation
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Cost allocation
ER26-1479-000 (Feb. 23, 2026) (“Compliance Filing”). 2 PJM’s Initial Brief and compliance filings would continue to treat generator interconnection studies and transmission service studies for co-located projects as distinct processes operating on different timelines, rather than as a synchronized…Read this passage Filed comments: Cost allocation
I. COMMENTS
printed heading
I.Read this passage
A. PJM Should Adopt a Coordinated Study Process for Co-Located Loads and
printed heading · Topic match: Connecting load and generation
The Eligible Customer must also identify details about the co-located generator in its transmission service request.Read this passage Filed comments: Connecting load and generation
B. Eligible Customer Definition As Applied Should Be Clarified.
printed heading · Topic match: Connecting load and generation
As used in Tariff, Part VI, Eligible Customer shall mean only 12 See Order No. 2023, 184 FERC ¶ 61,054 at P 18. 13 Replacement Rate Order, 193 FERC ¶ 61,217 at PP 225, 231. 6 those Eligible Customers that have submitted a Completed Application.14 Invenergy seeks confirmation on how the Commission…Read this passage Filed comments: Connecting load and generation
II. CONCLUSION
printed heading
CONCLUSION Invenergy respectfully requests that PJM and the Commission consider these comments and make such adjustments as necessary to ensure just and reasonable rates, terms, and conditions for co-located arrangements. 14 Tariff, Part I, section 1, Definitions – E – F. 15 Promoting Wholesale…Read this passage
CERTIFICATE OF SERVICE
printed heading
CERTIFICATE OF SERVICE I hereby certify that on this 16th day of March, 2026, a copy of the foregoing document has been electronically served upon each person designated on the official service list in this proceeding. /s/ Kathryn Douglass Kathryn Douglass Crowell & Moring LLP 1601 Wewatta Street,…Read this passage