Comments of Persistence Analytics Group LLC/ United Grid related to the Commission-Led Technical Conference re PJM Governance and Stakeholder Reforms
Text extracted from the eLibrary original (SHA-256 343791c662642146…). Download the original from the official source.
Contents · 5 sections
Read topic-matched comments in AD26-7
Topics in the text: Cost allocation · Reliability and curtailment
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text
Comments of Persistence Analytics Group LLC / United Grid - Docket No.Read this passage
I. The Governance Question Is Also an Evidence Question
printed heading · Topic match: Cost allocation
The Governance Question Is Also an Evidence Question The agenda for Panel 1 asks how PJM governance mechanics may impede PJM's ability to address operational and market needs, and what concrete, actionable solutions could better equip PJM's Board and PJM to tackle immediate and future challenges.Read this passage Filed comments: Cost allocation
II. Large Loads Require Better Classification Before Assumptions Harden
printed heading · Topic match: Cost allocation
That can distort planning, increase public-cost exposure, weaken ratepayer protection, and create stranded infrastructure risk if load forecasts, project timelines, financing conditions, or operating behavior change.Read this passage Filed comments: Cost allocation
III. Concrete, Actionable Reform Areas
printed heading
Concrete, Actionable Reform Areas The Commission asked for concrete, actionable solutions.Read this passage
IV. Dependable Demand Is Now a Reliability Issue
printed heading · Topic match: Cost allocation
PJM governance must be capable of verifying both sides of the system: generation performance and load behavior.Read this passage Filed comments: Cost allocation
V. Conclusion
printed heading
Conclusion Persistence Analytics Group LLC / United Grid respectfully encourages the Commission to consider PJM governance reforms that improve not only speed and accountability, but also the quality of evidence used to make planning, market, reliability, interconnection, and cost-allocation…Read this passage