Motion For Leave to Answer and Limited Answer of the Indicated PJM Transmission Owners to Constellation Energy Generation, LLC's 06/12/2025 Answer
Text extracted from the eLibrary original (SHA-256 7c8577ffe4045867…). Download the original from the official source.
Read topic-matched comments in EL25-49
Topics in the text: Connecting load and generation · Filing procedure
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Connecting load and generation
ER24-2172, the Commission rejected proposed amendments to the Interconnection Service Agreement among PJM, Susquehanna Nuclear, LLC (“Susquehanna”), and PPL Electric Utilities Corporation that would have increased the amount of 4 18 C.F.R. § 385.213(a)(2). 5 See, e.g., PJM Interconnection, L.L.C.,…Read this passage Filed comments: Connecting load and generation
Attachment A
printed heading · Topic match: Connecting load and generation
“That’s why we’re making the largest private sector investment in state history – $20B – to bring 1,250 high-skilled jobs and economic benefits to the state, while also collaborating with Talen Energy to help power our infrastructure with carbon-free energy.” The existing Susquehanna co-located…Read this passage Filed comments: Connecting load and generation
CERTIFICATE OF SERVICE
printed heading
Dated at Chicago, IL this 27th day of June, 2025. /s/ Geneva Kennedy Geneva Kennedy Exelon CorporationRead this passage