EL26-68-000 · 2026-06-29 · Individual No Affiliation

Comments of Lisa Melton concerning the integration of large, high-density electric loads and the associated deterministic stability and cost-allocation methodologies

An individual commenter files a short comment in EL26-68 and EL26-71 urging that any cost-allocation or stability method FERC adopts assign burdens to the large loads that cause them, and reserves rights over a proprietary framework she authored.

Asks FERC to: Consider the comment and take note of the commenter's reservation of rights over her proprietary stability and diagnostic framework.

A pro se comment captioned in the SPP (EL26-68) and CAISO (EL26-71) show cause dockets that supports cost-causation assignment of large-load burdens and gives notice of a claimed proprietary interest.

E-9 SPP: Show cause or propose tariff changes in 60 days (p. 5) E-10 CAISO: Show cause or propose tariff changes in 60 days (p. 5)

Key points

  1. The commenter says the public record shows large-load burdens being socialized onto residential and small commercial ratepayers.
    the burdens created by these loads are being socialized onto residential and small-commercial ratepayers rather than assigned on a cost-causation basis. PDF p. 1
  2. She urges any adopted method to assign burden to the loads that cause it.
    assigns burden to the loads that cause it and preserves reliability invariants at the point of interconnection. PDF p. 2
  3. She reserves rights over a proprietary framework with pending patent applications and asserts no claim in these dockets.
    Commenter reserves all rights, including the right to seek appropriate relief in the proper forum. PDF p. 2
Contents · 4 sections
  1. I. Interest of the Commenter p. 1
  2. II. Comment on the Subject Matter p. 1
  3. III. Reservation of Rights p. 2
  4. IV. Conclusion p. 2

Read topic-matched comments in EL26-68

Topics in the text: Cost allocation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Docket No.
Read this passage

I. Interest of the Commenter

printed heading

Interest of the Commenter Commenter is an independent author and developer of a published analytical framework addressing nodal equilibrium, deterministic stability invariants, and the allocation of reliability and capacity burdens created by large computational loads.
Read this passage

II. Comment on the Subject Matter

printed heading · Topic match: Cost allocation

Commenter respectfully submits that the public record now contains substantial evidence — including PJM capacity auction results, Independent Market Monitor findings, the NERC Level 3 Alert concerning large computational loads, and documented ratepayer cost-shift in transmission planning — that the…
Read this passage

III. Reservation of Rights

printed heading

Reservation of Rights Commenter has authored and publicly timestamped a proprietary diagnostic and stability framework and holds pending United States Patent and Trademark Office applications relating thereto.
Read this passage

IV. Conclusion

printed heading

Conclusion For the foregoing reasons, Commenter respectfully requests that the Commission consider this comment in the above-captioned proceedings and take note of the reservation of rights stated herein.
Read this passage