Wabash Valley Power Association, Inc. submits Request for Issuance of an Errata to the 06/18/2026 Order Instituting Proceedings Under Section 206 of the Federal Power Act
Wabash Valley Power Association asks FERC to issue an errata to the E-7 show cause order removing it from the caption and listing it with the non-jurisdictional transmission owners, since it ceased to be a public utility on January 1, 2025.
Asks FERC to: Issue an errata removing Wabash Valley from the caption of EL26-67-000 and adding it to the list of non-jurisdictional PJM transmission owners in footnote 13.
Seeks correction of the E-7 show cause order's list of respondents; FERC granted the change in its August 13, 2026 errata notice.
E-7 PJM: Show cause or propose tariff changes in 60 days (p. 7)
Key points
- Wabash says it ceased to be a public utility on January 1, 2025 because it is wholly owned by exempt cooperatives.
January 1, 2025 because it became exempt from the Federal Power Act as a result of being wholly owned by exempt entities. PDF p. 4
- Wabash says it is similarly situated to the non-jurisdictional owners FERC listed in footnote 13.
it is a PTO that is similarly situated to all of the other non-jurisdictional entities listed in footnote 13 of the Order. PDF p. 4
- Wabash does not dispute the need to address large-load and co-located load service in organized markets.
it does not dispute the need for the Commission to address issues surrounding service to large load and co-located load within organized markets and elsewhere. PDF p. 3
- The requested errata would remove Wabash from the caption and add it to footnote 13.
removes WVPA from the caption of Docket No. EL26-67-000, which intended to identify only PJM and jurisdictional PTOs PDF p. 5
Read topic-matched comments in EL26-67
Topics in the text: Connecting load and generation
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Connecting load and generation
REQUEST FOR ISSUANCE OF AN ERRATA To the Commission: On June 18, 2026, the Commission issued its “Order Instituting Proceeding Under Section 206 of the Federal Power Act” in this above captioned proceeding.1 In its Order, the Commission found that PJM Interconnection, L.L.C.’s (“PJM”) existing Open…Read this passage Filed comments: Connecting load and generation