Exhibit No. SPP-0001- Affidavit of Natasha Henderson
Text extracted from the eLibrary original (SHA-256 94447c5280fb1660…). Download the original from the official source.
Topics in the text: Connecting load and generation · Reliability and curtailment
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Pages 1 to 4
page range · Topic match: Connecting load and generation
In my current position, my primary duties are to oversee the policy development for the engineering department, including transmission planning, load connection, resource adequacy and generation interconnection, as well as the performance of technical studies and assessments necessary to respond to…Read this passage