Answer of Old Dominion Electric Cooperative in Opposition to Motion for Expedited Action of Constellation Energy Generation, LLC,
Text extracted from the eLibrary original (SHA-256 b1815447d9b31d62…). Download the original from the official source.
Contents · 3 sections
Read topic-matched comments in EL25-49
Topics in the text: Reliability and curtailment · Cost allocation · Connecting load and generation
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text
1 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C., et al. ) Docket No.Read this passage
I. RELEVANT BACKGROUND
printed heading · Topic match: Connecting load and generation
Constellation requested that the Commission grant the complaint on a fast-track basis, determine that the PJM Tariff is unjust, unreasonable and unduly discriminatory or preferential, and direct PJM to adopt in its Tariff certain portions of PJM’s Guidance on Co-Located Load.Read this passage Filed comments: Connecting load and generation
II. ANSWER
printed heading · Topic match: Reliability and curtailment
In addition to the issues raised in the Indicated PJM Transmission Owners’ Answer, ODEC submits that Constellation’s request for the Commission to direct that large load interconnection requests must be processed without regard to whether the load has arranged for wholesale transmission or…Read this passage Filed comments: Reliability and curtailment
III. CONCLUSION
printed heading
Clair Jenna Cliatt Thompson Coburn LLP 1909 K Street, N.W., Suite 600 Washington, D.C. 20006-1167 (202) 585-6900 (202) 585-6969 (fax) aclair@thompsoncoburn.com jcliatt@thompsoncoburn.com Attorneys for Old Dominion Electric Cooperative Dated: December 8, 2025 19 Constellation contends that “existing…Read this passage