Chairman David Rosner requests PJM Interconnection President and CEO, Manu Asthana's perspective re large load forecasting for America's significant…
Text extracted from the eLibrary original (SHA-256 0ef72cac6072ee18…). Download the original from the official source.
Read topic-matched comments in EL25-49
Topics in the text: Connecting load and generation
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Pages 1 to 2
page range · Topic match: Connecting load and generation
Given the size and volume of new large load interconnection requests, I’m optimistic that utilities have an opportunity to apply similar criteria to those currently used to assess the commercial readiness of large projects in the generator interconnection queue.Read this passage Filed comments: Connecting load and generation