EL25-49-002 · 2026-01-20 · Earthjustice

Public Interest Organizations submit Limited Request for Clarification of the 12/18/2025 Order

Text extracted from the eLibrary original (SHA-256 53fc7945f7d8b33a…). Download the original from the official source.

Contents · 5 sections
  1. I. Background p. 1
  2. II. Limited Request for Clarification p. 2
  3. A. We request clarification on how the rates for PJM’s p. 2
  4. B. Evaluating whether the status quo transmission rate design p. 7
  5. III. Conclusion p. 8

Read topic-matched comments in EL25-49

Topics in the text: Reliability and curtailment · Cost allocation · Connecting load and generation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

1 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) PJM Interconnection, et al. ) Docket No.
Read this passage

I. Background

printed heading · Topic match: Reliability and curtailment

Background Last February, the Commission took on the tough task of prompting PJM to revisit its processes for addressing large load arrangements.3 As part of the show cause proceeding, the Commission sought feedback from PJM and stakeholders on over thirty comprehensive briefing questions covering…
Read this passage Filed comments: Reliability and curtailment

II. Limited Request for Clarification

printed heading

II.
Read this passage

A. We request clarification on how the rates for PJM’s

printed heading · Topic match: Cost allocation

In addition to the question posed in the Show Cause Order, as noted above, Commissioner Rosner submitted a letter to PJM on September 18, 2025, noting that “we cannot efficiently plan the electric generation and transmission needed to serve new customers if we don’t forecast how much energy they…
Read this passage Filed comments: Cost allocation

B. Evaluating whether the status quo transmission rate design

printed heading · Topic match: Connecting load and generation

Evaluating whether the status quo transmission rate design for large load customers is still just and reasonable Given the unprecedented volume and scale of large-load requests, the Commission should evaluate whether existing transmission rate designs remain just and reasonable.
Read this passage Filed comments: Connecting load and generation

III. Conclusion

printed heading

Conclusion For the foregoing reasons, Earthjustice, Environmental Defense Fund, and Sierra Club respectfully request that the Commission clarify its December 18, 2025 Order.
Read this passage

CERTIFICATE OF SERVICE

printed heading

Dated: January 20, 2026. /s/ Aaron Stemplewicz Aaron Stemplewicz Earthjustice 1617 John F.