EL25-49-000 · 2026-04-24 · Indicated PJM Transmission Owners

Exhibit No. PTO-0006 – Illustrative Tariff Sheets

Text extracted from the eLibrary original (SHA-256 fe1371184ebb9689…). Download the original from the official source.

Read the parent filing

Read topic-matched comments in EL25-49

Topics in the text: Connecting load and generation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Pages 1 to 4

page range · Topic match: Connecting load and generation

Eligible Customer shall pay Ancillary Services charges, except for Regulation, based on the total quantity in MWhs of energy delivered to the Co-Located Load using Firm Contract Demand Transmission Service in accordance with Tariff, Part I, section 3.
Read this passage Filed comments: Connecting load and generation

Pages 5 to 8

page range · Topic match: Connecting load and generation

Eligible Customer shall pay Ancillary Services charges, except for Regulation, based on the total quantity in MWhs of energy delivered to the Co-Located Load using Non-Firm Contract Demand Transmission Service in accordance with Tariff, Part I, section 3.
Read this passage Filed comments: Connecting load and generation

Pages 9 to 12

page range · Topic match: Connecting load and generation

Three principal requirements apply to discounts for Non-Firm Contract Demand Transmission Service as follows: (1) any offer of a discount made by the Transmission Provider must be announced to all Eligible Customers solely by posting on the OASIS, (2) any customer-initiated requests for discounts…
Read this passage Filed comments: Connecting load and generation

Pages 13 to 16

page range · Topic match: Connecting load and generation

PTO-0006 Page 13 of 17 SCHEDULE [FP] Financial Penalty Charge for Unreserved Use by Co-Located Load An Eligible Customer taking Firm Contract Demand Transmission Service, Non-Firm Contract Demand Transmission Service, or Interim Network Integration Transmission Service on behalf of Co-Located Load…
Read this passage Filed comments: Connecting load and generation

Page 17

page range · Topic match: Connecting load and generation

PTO-0006 Page 17 of 17 Redlines to PJM OATT, Part I, Section 1 (Definitions) Responsible Customer: “Responsible Customer” shall mean customers using Interim Network Integration Transmission Service, Firm Contract Demand Transmission Service, Non-Firm Contract Demand Transmission Service,…
Read this passage Filed comments: Connecting load and generation