Motion for Leave and Answer of Constellation Energy Generation, LLC to Indicated PJM Transmission Owner's Rehearing Request
Text extracted from the eLibrary original (SHA-256 0baee63c685fd4cc…). Download the original from the official source.
Read topic-matched comments in EL25-49
Topics in the text: Filing procedure · Connecting load and generation · Credit and exit
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Filing procedure
ER26-1479-000 MOTION FOR LEAVE AND ANSWER OF CONSTELLATION ENERGY GENERATION, LLC Constellation submits this motion for leave and answer1 to emphasize one point: if the Commission’s goal is to interconnect loads faster than the current 7-to-10-year timeframe,2 it must 1 Constellation Energy…Read this passage Filed comments: Filing procedure
CONCLUSION
printed heading · Topic match: Filing procedure
CONCLUSION For the reasons stated above, Constellation respectfully requests that the Commission grant Constellation’s Request for Rehearing of the June 2026 Co-Location Order and reject the Transmission Owner Rehearing Requests. 11 See generally Request for Rehearing and Clarification of…Read this passage Filed comments: Filing procedure
CERTIFICATE OF SERVICE
printed heading
CERTIFICATE OF SERVICE I hereby certify that I have on this 4th day of August 2026, caused to be served a copy of the foregoing upon all parties on the service lists in these proceedings in accordance with the requirement of Rule 2010 of the Commission’s Rules of Practice and Procedure, 18 C.F.R. §…Read this passage