Answer of The Dayton Power and Light Company d/b/a AES Ohio to Order Instituting Proceeding Under Section 206 of the Federal Power Act and Consolidating…
Text extracted from the eLibrary original (SHA-256 7642d080d5e5ebe4…). Download the original from the official source.
Read topic-matched comments in EL25-49
Topics in the text: Connecting load and generation · Cost allocation · Reliability and curtailment
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Connecting load and generation
AES Ohio is open to working with PJM and stakeholders to explore alternative transmission service arrangements for certain co-located load configurations that may be appropriate to reflect specific co-located load circumstances and associated system needs.Read this passage Filed comments: Connecting load and generation
Attachment A
printed heading · Topic match: Connecting load and generation
AES Ohio’s understanding is that, pursuant to the PJM Tariff, if the generator changes its ISA to enable it to operate in a co-located load arrangement, then any system upgrades must be paid for by the existing removed generator in order to avoid cost subsidization by existing transmission…Read this passage Filed comments: Connecting load and generation
CERTIFICATE OF SERVICE
printed heading
RappoltRead this passage