ER26-3380-000 · 2026-08-21 · Vistra Corp.

Limited Protest of Vistra Corp. re PJM Interconnection, L.L.C.’s proposed Reliability Backstop Procurement mechanism

Text extracted from the eLibrary original (SHA-256 6195277c3dd4d4c0…). Download the original from the official source.

Contents · 2 sections
  1. I. LIMITED PROTEST p. 2
  2. II. CONCLUSION p. 7

Read topic-matched comments in ER26-3380

Topics in the text: Reliability and curtailment · Cost allocation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Reliability and curtailment

Vistra generally supports the proposal to use a backstop mechanism to address near-term the resource adequacy needs in the PJM system, even as Vistra believes it is critically important to ensure that the “ordinary” tools for ensuring resource adequacy, including the Reliability Pricing Model…
Read this passage Filed comments: Reliability and curtailment

I. LIMITED PROTEST

printed heading · Topic match: Cost allocation

Second, PJM’s proposal is unduly discriminatory because it excludes Fixed Resource Requirement (“FRR”) entities from RBP cost allocation based on the very cost causation principle described above, while not applying the principle to other entities to which it equally applies.11 PJM proposes to…
Read this passage Filed comments: Cost allocation

II. CONCLUSION

printed heading · Topic match: Reliability and curtailment

While there are important near-term challenges to address, in the long term, price signals based on market fundamentals are critical to ensuring resource adequacy and affordability.
Read this passage Filed comments: Reliability and curtailment

CERTIFICATE OF SERVICE

printed heading

Dated: August 21, 2026 San Francisco, CA /s/ Jenae Sharp Jenae Sharp Wilson Sonsini Goodrich & Rosati One Market Plaza, Spear Tower #3300 San Francisco, CA 94105 (650) 722-6123 jmsharp@wsgr.com
Read this passage