EL25-49-000 · 2025-04-23 · Constellation Energy Generation, LLC

Exhibit 2 (Ming)

Text extracted from the eLibrary original (SHA-256 f10dfb0e3dca8755…). Download the original from the official source.

Read the parent filing

Read topic-matched comments in EL25-49

Topics in the text: Connecting load and generation · Reliability and curtailment · Cost allocation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

EXHIBIT 2 TESTIMONY OF ZACHARY MING UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C., et al.
Read this passage

Table of Contents

printed heading · Topic match: Connecting load and generation

PJM has put forward eight options for service to large loads, three of which they 4 describe as “already existing” and five of which they describe as “potential options 5 that have been proposed by others or developed by PJM in response to issues raised 6 in the various predecessor co-located load…
Read this passage Filed comments: Connecting load and generation