Attachment_A_E3_ELCC_RRS_Model_Evaluation_Dec2025
Text extracted from the eLibrary original (SHA-256 a0e66b7a515744bb…). Download the original from the official source.
Contents · 10 sections
Read topic-matched comments in ER26-3380
Topics in the text: Reliability and curtailment
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text
PJM ELCC / RRS Model Evaluation Prepared for PJM December 2025 415.391.5100 | 44 Montgomery Street, Suite 1250, San Francisco, CA 94104 | www.ethree.com Project Team Zach Ming Ruoshui Li Hugh Somerset Melissa Rodas Nick Schlag Energy and Environmental Economics, Inc. (E3) 44 Montgomery Street,…Read this passage
Table of Contents
printed heading
Table of Contents Executive Summary _______________________________________________________________ 2 Overview of Loss-of-Load-Probability Modeling and Best Practices ________________ 2 Evaluation of PJM ELCC/RRS Model ______________________________________________ 3 Considerations for Improvement…Read this passage
Executive Summary
printed heading · Topic match: Reliability and curtailment
Overview of Loss-of-Load-Probability Modeling and Best Practices Ensuring resource adequacy requires accurate analysis to evaluate whether sufficient generating resources will be available when needed to meet demand.Read this passage Filed comments: Reliability and curtailment
Executive Summary
printed heading · Topic match: Reliability and curtailment
A summary of E3’s assessment of key model features is provided below, where “pros” reflect how the current model is consistent with industry best practices for modeling resource adequacy risk, and “cons” reflect potential areas of improvement.Read this passage Filed comments: Reliability and curtailment
Executive Summary
printed heading
Executive Summary PJM ELCC / RRS Model Evaluation 4 develop resource-class profiles appropriately represent geographic diversity and correlations between variable resources.Read this passage
Executive Summary
printed heading
Executive Summary PJM ELCC / RRS Model Evaluation 5 5.Read this passage
Summary
printed heading
Summary E3 concludes that PJM’s ELCC/RRS model is fit for purpose, sophisticated, and aligned with industry best practices.Read this passage
Introduction
printed heading
Introduction PJM ELCC / RRS Model Evaluation 6Read this passage
Introduction
printed heading · Topic match: Reliability and curtailment
Introduction The PJM regional transmission organization is responsible for maintaining resource adequacy within the PJM footprint through the administration of a capacity market (the “Reliability Pricing Model”). 3 This market is designed to allow loads and generators to transact “capacity” through…Read this passage Filed comments: Reliability and curtailment
Introduction
printed heading · Topic match: Reliability and curtailment
Among its six guiding principles for resource adequacy, ESIG’s Redefining Resource Adequacy Task Force includes a direct endorsement that “[c]hronological operations must be modeled across many weather years” elaborating: “Modeling sequential grid operations is critical to capture the whole…Read this passage Filed comments: Reliability and curtailment
Conclusion
printed heading
Conclusion PJM ELCC / RRS Model Evaluation 88Read this passage
Conclusion
printed heading
Conclusion E3’s independent evaluation concludes that PJM’s Effective Load Carrying Capability / Reserve Requirement Study (ELCC/RRS) Model is a technically sound, well-structured, and transparent reliability modeling framework that accurately determines PJM’s capacity requirements and resource…Read this passage