ER26-3515-002 · 2026-11-09 · PJM

FERC rendition of the electronically filed tariff records

Contents · 4 sections
  1. Attachment K-Appendix, section 2. p. 6
  2. II. RESPONSBILITIES OF THE OFFICE OF THE INTERCONNECTION p. 26
  3. III. RESPONSBILITIES OF ELECTRIC DISTRIBUTORS p. 28
  4. A. To perform the studies required to determine the Forecast Pool Requirement and Daily p. 62

Read the parent filing

Read topic-matched comments in ER26-3515

Topics in the text: Registry access · Connecting load and generation · Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Registry access

Legacy Policy: “Legacy Policy” shall mean any legislative, executive, or regulatory action that specifically directs a payment outside of PJM Markets to a designated or prospective Generation Capacity Resource and the enactment of such action predates October 1, 2021, regardless of when any…
Read this passage Filed comments: Registry access

Attachment K-Appendix, section 2.

printed heading · Topic match: Connecting load and generation

Non-Curtailment Charge: “Non-Curtailment Charge” shall mean the charge applicable to Demand Resources and Price Responsive Demand as defined in Tariff, Attachment DD, section 10B(b).
Read this passage Filed comments: Connecting load and generation

II. RESPONSBILITIES OF THE OFFICE OF THE INTERCONNECTION

printed heading · Topic match: Registry access

RESPONSBILITIES OF THE OFFICE OF THE INTERCONNECTION The Office of the Interconnection shall maintain the Large Load Registry, pursuant to Reliability Assurance Agreement, Schedule 11.
Read this passage Filed comments: Registry access

III. RESPONSBILITIES OF ELECTRIC DISTRIBUTORS

printed heading · Topic match: Registry access

RESPONSBILITIES OF ELECTRIC DISTRIBUTORS Electric Distributors shall coordinate with the Office of the Interconnection in developing and maintaining the Large Load Registry by providing the Office of the Interconnection any information or data the Electric Distributor believes appropriate to…
Read this passage Filed comments: Registry access

A. To perform the studies required to determine the Forecast Pool Requirement and Daily

printed heading · Topic match: Registry access

The Office of the Interconnection also may consult with the Large Load. (d) Based on the information provided, or caused to be provided, by each entity bound by the Operating Agreement, as well as other information provided by, for example, Electric Distributors, the Office of the Interconnection…
Read this passage Filed comments: Registry access