EL26-67-000 · 2026-08-10 · Natural Gas Supply Association (DC)

Comments of the Natural Gas Supply Association on the Informational Reports re Resource Adequacy Measures and Proposals, PJM Interconnection L.L.C., et al

The Natural Gas Supply Association writes Chairman Swett on the RTO informational reports, asking FERC to have RTOs and ISOs add an assessment of whether gas pipeline infrastructure and fuel supply can support projected demand growth.

Asks FERC to: Direct RTOs and ISOs to supplement their resource adequacy informational reports with a section on gas infrastructure sufficiency, regional shortfall initiatives and generator fuel adequacy efforts.

Comment on the 30-day adequacy reports all six show cause orders required, asking that those reports and future updates address gas pipeline and fuel assurance.

E-7 PJM: 30-day report on serving large loads with adequate generation (p. 8) E-8 MISO: 30-day report on serving large loads with adequate generation (p. 7) E-9 SPP: 30-day report on serving large loads with adequate generation (p. 7) E-10 CAISO: 30-day report on serving large loads with adequate generation (p. 7) E-11 ISO-NE: 30-day report on serving large loads with adequate generation (p. 7) E-12 NYISO: 30-day report on serving large loads with adequate generation (p. 7)

Key points

  1. NGSA says gas generation in PJM's queue grew 1,458 percent in two years, from about 6,800 MW to 106,000 MW.
    the amount of natural gas generation in PJM’s interconnection queue has increased by a staggering 1,458% (surging from approximately 6,800 MW to 106,000 MW PDF p. 2
  2. It says gas requests dominate MISO's expedited queue at 75 percent.
    capturing 75% of the new expedited capacity requests. PDF p. 2
  3. It says delivery infrastructure, not supply, limits regional energy security, so generation cannot be separated from fuel assurance.
    Simply put, generation cannot be separated from fuel assurance. PDF p. 2
  4. NGSA asks for three supplemental report items on pipeline assessment, regional initiatives and fuel adequacy.
    How they assess whether regional natural gas infrastructure can support the expected growth in natural gas for power generation. PDF p. 3
Contents · 3 sections
  1. I. Natural Gas is Critical to Supporting Large Load Growth p. 1
  2. II. Infrastructure Constraints Threaten Reliability Efforts p. 2
  3. III. Conclusion and Specific Request for Supplemental Reporting p. 2

Read topic-matched comments in EL26-67

Topics in the text: Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Reliability and curtailment

August 10, 2026 The Honorable Laura Swett, Chairman Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 Re: Informational Reports Regarding Resource Adequacy Measures and Proposals, PJM Interconnection L.L.C., Docket No.
Read this passage Filed comments: Reliability and curtailment

I. Natural Gas is Critical to Supporting Large Load Growth

printed heading

Similarly, there has been an incredible shift in MISO, where gas requests have spiked over the last 24 months to now dominate the fast-track Expedited Resource Addition (ERAS) queue, capturing 75% of the new expedited capacity requests.
Read this passage

II. Infrastructure Constraints Threaten Reliability Efforts

printed heading · Topic match: Reliability and curtailment

Failing to account for the full energy ecosystem—including necessary pipeline infrastructure—limits the regional operators’ ability to achieve full success in these critical resource adequacy initiatives.
Read this passage Filed comments: Reliability and curtailment

III. Conclusion and Specific Request for Supplemental Reporting

printed heading

Conclusion and Specific Request for Supplemental Reporting NGSA does not ask the Commission or RTOs to reprioritize their current, complex workloads regarding large load integration.
Read this passage