EL25-49-000 · 2025-04-23 · Southern California Edison Company and Pacific Gas and Elect

Reply Comments of Southern California Edison Company and Pacific Gas and Electric Company in response to PJM Interconnection, L.L.C.'s Answer filed on…

Text extracted from the eLibrary original (SHA-256 33e130cebe418774…). Download the original from the official source.

Contents · 7 sections
  1. I. INTRODUCTION p. 1
  2. II. REPLY COMMENTS p. 2
  3. A. Jurisdictional Issues p. 3
  4. B. Any Tariff Revisions Should Adequately Address Resource Adequacy p. 6
  5. C. Co-Located Loads Must Pay Their Fair Share of Costs p. 7
  6. D. Regional Differences May Require Different Approaches p. 9
  7. III. CONCLUSION p. 10

Read topic-matched comments in EL25-49

Topics in the text: Connecting load and generation · Cost allocation · Reliability and curtailment

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

1 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Technical Conference on Large Loads Co-Located at Generating Facilities (AD24-11-000); Constellation Energy Generation, LLC v.
Read this passage

I. INTRODUCTION

printed heading

INTRODUCTION Pursuant to Rule 213 of the Federal Energy Regulatory Commission’s (FERC or Commission) Rules of Practice and Procedure,1 Southern California Edison Company (SCE) and Pacific Gas and Electric Company (PG&E) (jointly California Utilities) respectfully submit these Reply Comments to the…
Read this passage

II. REPLY COMMENTS

printed heading · Topic match: Connecting load and generation

In addressing issues related to co-located load, the Commission must ensure that: • States retain their exclusive authority to determine who may serve co- located load and the rates and regulations for co-located load; • Co-located loads are adequately studied for Resource Adequacy and reliability…
Read this passage Filed comments: Connecting load and generation

A. Jurisdictional Issues

printed heading · Topic match: Connecting load and generation

States must retain their authority to assess appropriate public policy charges, such as charges for wildfire mitigation, wildfire recovery, and state-sponsored equity programs, and to regulate the types of generation used in serving retail load.
Read this passage Filed comments: Connecting load and generation

B. Any Tariff Revisions Should Adequately Address Resource Adequacy

printed heading · Topic match: Connecting load and generation

If an ISO/RTO Tariff sets rules dictating which types of retail load that load-serving entities must purchase capacity for, at a minimum, the Tariff must be clear as to how co-located load will be treated and who will be responsible for procuring capacity for the load.
Read this passage Filed comments: Connecting load and generation

C. Co-Located Loads Must Pay Their Fair Share of Costs

printed heading · Topic match: Connecting load and generation

The Commission would, however, have jurisdiction over transmission charges assessed to co-located load where either the co-located load or the generator is connected to the transmission system. 9 generator how or whether such cost is passed onto the co-located load.
Read this passage Filed comments: Connecting load and generation

D. Regional Differences May Require Different Approaches

printed heading

For instance, as relevant to the California Utilities, any future CAISO Tariff provisions relating to co- located facilities must necessarily function within California’s unique regulatory environment.
Read this passage

III. CONCLUSION

printed heading

CONCLUSION The California Utilities appreciate the opportunity to provide these Reply Comments to the Commission and respectfully request that the Commission consider the foregoing comments in its Order addressing PJM’s Tariff.