Comments of Ohio Energy Leadership Council on the Reliability Backstop Procurement proposed by PJM Interconnection, L.L.C
Text extracted from the eLibrary original (SHA-256 bbe2c2df1823e8a6…). Download the original from the official source.
Contents · 5 sections
Read topic-matched comments in ER26-3380
Topics in the text: Cost allocation · Reliability and curtailment
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C. ) ) ) Docket No.Read this passage
I. SUMMARY AND REQUESTED COMMISSION ACTION
printed heading · Topic match: Reliability and curtailment
Accordingly, OELC respectfully requests that the Commission condition any acceptance of PJM’s RBP proposal on the following: 1.Read this passage Filed comments: Reliability and curtailment
II. OELC’S INTEREST AND EXPERIENCE
printed heading · Topic match: Cost allocation
OELC and its members have direct, long-standing experience with the practical effects of utility tariffs, rate design, energy legislation, and regulatory policy on Ohio businesses that must manage significant energy consumption and exposure to volatile energy costs.Read this passage Filed comments: Cost allocation
IV. The Commission Should Require PJM To Use PLC Values Not a Customer’s Highest
printed heading · Topic match: Cost allocation
A capacity- related classification must be based on capacity-related data.Read this passage Filed comments: Cost allocation
V. PJM’S RBP RESOURCE-SELECTION METHODOLOGY IS NOT JUST AND
printed heading · Topic match: Reliability and curtailment
A just-and-reasonable remedy must be designed to obtain the resources most capable of serving load during the reliability-risk conditions for which the backstop is being created.Read this passage Filed comments: Reliability and curtailment
VI. CONCLUSION AND RECOMMENDATIONS.
printed heading · Topic match: Cost allocation
OELC’s concern is that the cost of that reliability must be assigned in a manner consistent with the actual source of the need.Read this passage Filed comments: Cost allocation
CERTIFICATE OF SERVICE
printed heading
ER26-3380-000. /s/ David F.Read this passage