EL25-49-000 · 2026-04-24 · Old Dominion Electric Cooperative

Reply of Old Dominion Electric Cooperative to Responses to Initial Briefs of PJM Interconnection, L.L.C. and Indicated Transmission Owners

Text extracted from the eLibrary original (SHA-256 de5bbbad2d4394d0…). Download the original from the official source.

Contents · 2 sections
  1. A. PJM Must Ensure that Service to Co-Located Loads Does Not Adversely p. 4
  2. B. The Commission Should Accept the Indicated PJM TOs’ Grid Reliance p. 5

Read topic-matched comments in EL25-49

Topics in the text: Connecting load and generation · Reliability and curtailment · Filing procedure

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Connecting load and generation

ODEC reiterates its request that the Commission address these issues, particularly clarification regarding how a generation and transmission cooperative like ODEC will meet PJM’s proposed requirement that an Eligible Customer must be designated to take transmission service on behalf of a Co-Located…
Read this passage Filed comments: Connecting load and generation

A. PJM Must Ensure that Service to Co-Located Loads Does Not Adversely

printed heading

Instead, such penalties must be limited to and borne by the Co-Located Loads.
Read this passage

B. The Commission Should Accept the Indicated PJM TOs’ Grid Reliance

printed heading · Topic match: Connecting load and generation

These services may not reflect the full use or reliance on the transmission system by Co-Location Arrangements, and Co-Located Loads must pay their fair share.
Read this passage Filed comments: Connecting load and generation

CERTIFICATE OF SERVICE

printed heading

Clair
Read this passage