ER26-3650-000 · 2026-08-28 · Midcontinent Independent System Operator, Inc.

Tab B - IRR Tariff Clean.pdf

Contents · 2 sections
  1. I. Applicability of Large Load Reliability Requirements p. 30
  2. II. Transition Provisions p. 31

Read the parent filing

Read topic-matched comments in ER26-3650

Topics in the text: Reliability and curtailment · Cost allocation · Credit and exit

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Reliability and curtailment

Commercial Operation Date: Shall have the meaning set forth in Attachment X of this Tariff.
Read this passage Filed comments: Cost allocation

I. Applicability of Large Load Reliability Requirements

printed heading

Applicability of Large Load Reliability Requirements The Transmission Customer taking Transmission Service on behalf of a Large Load shall be responsible for complying with each of the requirements of this Section 37A applicable to each Large Load it represents.
Read this passage

II. Transition Provisions

printed heading

The process by which Transmission Provider will make such a determination and which, if any, of the requirements of this Section 37A are to be applied shall be as set forth in the Business Practices Manual for Large Load.
Read this passage