ER26-3380-000 · 2026-09-22 · American Transmission Systems, Inc., Mid-Atlantic Interstate Transmission and 6 others

Motion for Leave to Answer and Answer of Indicated PJM Transmission Owners to the Motion for Leave to Answer and Answer of PJM Interconnection, L.L.C. filed…

Text extracted from the eLibrary original (SHA-256 5dc0cd41282d1e5b…). Download the original from the official source.

Contents · 3 sections
  1. I. MOTION FOR LEAVE TO ANSWER p. 2
  2. II. PROPOSED ANSWER p. 2
  3. III. CONCLUSION p. 3

Read topic-matched comments in ER26-3380

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text

ER26- 3380-000 (Sept. 10, 2026) (“PJM Answer”). 2 the Reliability Backstop Procurement (“RBP”) is loads (served by LSEs).4 And, thus, any and all costs associated with the RBP must be borne by LSEs, and not TOs.
Read this passage

I. MOTION FOR LEAVE TO ANSWER

printed heading

MOTION FOR LEAVE TO ANSWER Just as the Commission’s rules do not permit as of right PJM’s proposed answer to the various protests in this Docket, they do not permit as of right the Indicated PJM Transmission Owners’ proposed answer to PJM’s proposed answer.5 The Commission nonetheless retains…
Read this passage

II. PROPOSED ANSWER

printed heading

PJM does not and cannot explain how it is consistent with Duquesne Light Company and cost-causation principles to impose RBP exit fees on a TO as opposed to an LSE.
Read this passage

III. CONCLUSION

printed heading

CONCLUSION For the foregoing reasons, the Indicated PJM Transmission Owners respectfully request that the Commission accept this answer and reject PJM’s proposed Exit Amendment.
Read this passage

CERTIFICATE OF SERVICE

printed heading

Dated at New York, NY, this 22nd day of September, 2026. /s/ Sanford I.
Read this passage