Att-A_Large-Loads_Clean-Tariff
Text extracted from the eLibrary original (SHA-256 b9dda850de7019d7…). Download the original from the official source.
Topics in the text: Connecting load and generation · Reliability and curtailment · Cost allocation
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Attachment A – Clean Tariff
printed heading · Topic match: Connecting load and generation
The CAISO shall post on the CAISO Website an advance notice whenever a Scoping Meeting will be held with an Affiliate of a Participating TO. * * * * * 6.7.2.9 Co-located Load Modifications The Interconnection Customer may request, and the CAISO and Participating TO will evaluate, the removal of…Read this passage