Comments of the Solar Energy Industries Association in response to PJM Interconnection, L.L.C.’s filing to establish Interim Resource Adequacy Service
Text extracted from the eLibrary original (SHA-256 56461b7cb7864e63…). Download the original from the official source.
Contents · 4 sections
Read topic-matched comments in ER26-3515
Topics in the text: Connecting load and generation · Reliability and curtailment · Registry access
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Reliability and curtailment
As the trade association representing both utility-scale and 1 18 C.F.R. § 385.213 (2026). 2 PJM Interconnection, L.L.C., Proposal to Establish Interim Resource Adequacy Service & a Large Load Registry, Docket No.Read this passage Filed comments: Reliability and curtailment
I. Comments: To make BYONC more effective, PJM must remove market barriers for
printed heading · Topic match: Connecting load and generation
Comments: To make BYONC more effective, PJM must remove market barriers for Surplus and Distributed Energy Resources.Read this passage Filed comments: Connecting load and generation
A. Surplus Resources: Barriers to BYONC Participation and Solutions
printed heading · Topic match: Connecting load and generation
ER26-3380, existing PJM rules limit the ability for Surplus Resources to add capacity to the PJM system.18 Currently, PJM only grants capacity interconnection rights (CIRs) and capacity accreditation to surplus resources that merge with the existing facility as a single hybrid resource,19 a…Read this passage Filed comments: Connecting load and generation
B. Distributed Energy Resources: Barriers to BYONC Participation and
printed heading · Topic match: Connecting load and generation
For PJM, DER Capacity Aggregation Resources cannot participate in the capacity auction until the 2028/2029 Base Residual Auction.25 PJM will allow DER Aggregations to support a BYONC.26 The BYONC construct is a program designed to help address the capacity shortfalls that begin in the 2027/2028…Read this passage Filed comments: Connecting load and generation
II. CONCLUSION
printed heading · Topic match: Reliability and curtailment
Accordingly, SEIA requests that the Commission and PJM consider the market refinements identified in these comments.Read this passage Filed comments: Reliability and curtailment