ER26-3552-000 · 2026-09-08 · Google LLC

Comments of Google LLC on Midcontinent Independent System Operator Inc.’s Zero Injection Generator Interconnection Agreement proposal

Text extracted from the eLibrary original (SHA-256 ac9329da980b2107…). Download the original from the official source.

Read topic-matched comments in ER26-3552

Topics in the text: Connecting load and generation · Cost allocation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Connecting load and generation

It recognizes the importance of accounting for how a generator will operate in practice when studying generator interconnection requests, including the reality that generators serving electrically proximate loads can “minimize the impact on the transmission system.”4 Specifically, the ZGIA would…
Read this passage Filed comments: Connecting load and generation

CERTIFICATE OF SERVICE

printed heading

Dated: September 8, 2026 Washington, D.C. /s/ Bryan Shpall Bryan Shpall Wilson Sonsini Goodrich & Rosati 1700 K Street NW Fifth Floor Washington, DC 20006