EL25-49-000 · 2026-02-12 · Exelon Corporation, The FirstEnergy Transmission Companies

Answer of Exelon Corporation et al. in Opposition to Constellation Energy Generation LLC's 02/02/2026 Motion and Answer to the 01/16/2026 Rehearing Request

Text extracted from the eLibrary original (SHA-256 2e72b196bf164bd9…). Download the original from the official source.

Read topic-matched comments in EL25-49

Topics in the text: Filing procedure · Connecting load and generation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Opening text

opening text · Topic match: Filing procedure

The co-location arrangement of Talen Energy and its subsidiary 3 Id. § 385.713(d)(1); see id. § 385.213(a)(2) (“An answer may not be made to . . . a request for rehearing[] unless otherwise ordered by the decisional authority.”). 4 See, e.g., PJM Interconnection, L.L.C., 193 FERC ¶ 61,229, at P 13…
Read this passage Filed comments: Filing procedure

CERTIFICATE OF SERVICE

printed heading

Dated at Chicago, IL this 12th day of February, 2026. /s/ Geneva Kennedy Geneva Kennedy Exelon Corporation