Supplemental Comments of Persistence Analytics Group LLC re Cost-Causation Revalidation related to PJM Interconnection, L.L.C.’s proposed Reliability…
Text extracted from the eLibrary original (SHA-256 ded355354ed92360…). Download the original from the official source.
Contents · 6 sections
Read topic-matched comments in ER26-3380
Topics in the text: Cost allocation · Reliability and curtailment
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C.Read this passage
I. INTRODUCTION
printed heading · Topic match: Cost allocation
It is: What evidence supports that cost-causation conclusion, what conditions must remain true for it to continue to hold, and what material change should require the conclusion to be revalidated? 1Read this passage Filed comments: Cost allocation
II. INITIAL COST CAUSATION SHOULD NOT BE TREATED AS
printed heading · Topic match: Cost allocation
INITIAL COST CAUSATION SHOULD NOT BE TREATED AS PERMANENT COST CAUSATION A cost-causation determination may be reasonable when made and still become stale if the underlying large-load, project, contractual, or operational facts later change.Read this passage Filed comments: Cost allocation
III. MATERIAL CHANGES SHOULD TRIGGER COST-CAUSATION
printed heading
MATERIAL CHANGES SHOULD TRIGGER COST-CAUSATION REVALIDATION PAG respectfully recommends that PJM’s implementation framework identify specific material-change events that require the cost-causation determination to be revisited before continued allocation or reassignment of RBP-related costs.Read this passage
IV. DEFAULT RISK SHOULD NOT AUTOMATICALLY TRANSFER COSTS
printed heading
DEFAULT RISK SHOULD NOT AUTOMATICALLY TRANSFER COSTS WITHOUT A FRESH EVIDENTIARY DETERMINATION The Kentucky Attorney General has specifically raised concern regarding the potential for prudent Load Serving Entities to bear costs following default by the responsible entity.Read this passage
V. LONG-DURATION OBLIGATIONS REQUIRE LONG-DURATION
printed heading · Topic match: Cost allocation
This approach would improve ratepayer protection without displacing PJM’s operational authority or the jurisdiction of state regulators.Read this passage Filed comments: Cost allocation
VI. CONCLUSION
printed heading · Topic match: Cost allocation
These recommendations would complement, rather than replace, the ratepayer-protection concerns already raised in this proceeding.Read this passage Filed comments: Cost allocation
CERTIFICATE OF SERVICE
printed heading
ER26-3380-000 in accordance with Rule 2010 of the Commission's Rules of Practice and Procedure.Read this passage