ER27-529-000 · 2026-11-16 · New York Independent System Operator, Inc., Central Hudson Gas & Electric Corporation and 5 others

Att G Pro Forma Facilities Study Agreement

Text extracted from the eLibrary original (SHA-256 ca1287ba75deeb35…). Download the original from the official source.

Read the parent filing

Topics in the text: Registry access · Cost allocation · Connecting load and generation

Source sections

Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.

Attachment G

printed heading

Attachment G Pro Forma Facilities Study Agreement 44.16.8 Appendix 8 to Attachment LL – Pro Forma Facilities Study Agreement PRO FORMA FACILITIES STUDY AGREEMENT BETWEEN [TRANSMISSION OWNER LEGAL NAME] (Transmission Owner) AND [LARGE LOAD CUSTOMER LEGAL NAME] (Large Load Customer) [Project Name] –…
Read this passage

TABLE OF CONTENTS

printed heading · Topic match: Registry access

Any engineering, procurement, construction, or interconnection of the Large Load Project shall be governed by one or more separate agreements, which may include a Security Agreement, [an applicable Transmission Service Agreement], a Network Upgrade Cost Recovery Agreement, an engineering and…
Read this passage