Comments of the Arkansas Public Service Commission in Support of MISO Application
The Arkansas Public Service Commission files short comments supporting MISO's Large Load Addition Resource Study filing, adopting the Mississippi and Louisiana commissions' comments and calling LARS a reasonable response to the show cause order.
Asks FERC to: Accept MISO's LARS filing.
Supports MISO's LARS filing as an answer to the E-8 show cause order, citing the order's preliminary finding on generator interconnection study procedures for electrically proximate large loads.
E-8 MISO: Show cause or propose tariff changes in 60 days (p. 5)
Key points
- The Arkansas PSC supports LARS and joins the Mississippi and Louisiana commissions' comments.
The APSC supports MISO's filing to establish the LARS process, and agrees with the comments made by the Mississippi Public Service Commission and the Louisiana Public Service Commission. Source text
- It says LARS aligns with the show cause order's requirements.
AR agrees that LARS is a reasonable response to and aligns with the requirements of the Commission's Show Cause Order. Source text
Read topic-matched comments in ER27-25
Topics in the text: Connecting load and generation
What the document says
Unpaginated filing
Supporters want FERC to accept LARS as filed, citing its entry limits and fuel neutrality.
agrees with the comments made by the Mississippi Public Service Commission and the Louisiana Public Service Commission. Source text
Source sections
Printed headings where available; page ranges otherwise. Excerpts below are selected from the text by keyword.
Opening text
opening text · Topic match: Connecting load and generation
Further, AR agrees that LARS is a reasonable response to and aligns with the requirements of the Commission’s Show Cause Order.[fn:2] Therefore, the APSC respectfully request that the Commission accept MISO’s LARS filing.Read this passage Filed comments: Connecting load and generation
CERTIFICATE OF SERVICE
printed heading
Box 400 Little Rock, AR 72201-4314 Telephone: (501) 682-5766 E-mail: luke.kinder@arkansas.govRead this passage
Footnotes
Word notes
Footnotes [fn:1] 18 C.F.R. § 385.212. [fn:2] See Show Cause Order at P 113 (noting that the Commission preliminarily found that MISO’s existing Tariff “may be unjust and unreasonable because it does not provide generator interconnection study procedures and services that account for the operational…Read this passage